Home / Products / Infrastructure PMO
UK · Infrastructure PMOInfrastructure Project and Approval Management Software in the UK
On UK infrastructure and development sites, delivery depends on highway authority agreements and street works permits, sewer adoption with the water company, connections from the distribution network operator and telecom agreements. The Shyphan Infrastructure PMO tracks each of these per package, next to weighted milestones, site progress, documents and risks.
Prefer to talk? Call +91 95651 53545Book a demo
Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Approvals and submissions tracked in the United Kingdom
Authorities, approval stages and municipality departments are master data, set up for your market during implementation.
What infrastructure teams in the United Kingdom struggle with
How the Infrastructure PMO works in the United Kingdom
- Configure UK mastersShyphan sets up your highway authorities, water companies, DNOs and Openreach as authorities, with stages such as technical approval, agreement, inspection and adoption.
- Set up each packageThe PMO creates the project with its code, location, client, manager and director, and loads physical milestones such as earthworks, drainage, ducting, surfacing and road marking with their weightage.
- Register agreements and permitsEach Section 278, Section 38, Section 104, permit or connection stage is logged with its date, expected date, reference and responsible engineer.
- Report progress from siteSite managers update milestone percentages with a constraint, next action and photo; completion recalculates from the weights.
- Keep evidence with the packageDrawings, technical approval letters, inspection records and certificates go into the document register, and utilities clashes go into the risk register.
- Review exceptions and reportDirectors act on overdue approvals and late milestones from the dashboard, and the PMO exports standard reports to PDF or Excel for board and client meetings.
Infrastructure PMO modules
12 modules in the live demo. The main ones are below with what each covers.
Executive Dashboard
- Portfolio totals for projects, average completion against plan, critical projects, open approvals, Amanah reports and open issues
- Portfolio progress bar chart of actual against planned baseline, with a click through to Project 360
- Project health and project status distribution
- Projects Requiring Attention list covering overdue approvals, schedule variance, late milestones, critical issues and approaching due dates
- Filter by project director
Project Portfolio
- Card and table views of every infrastructure package under PMO monitoring
- Overall completion, planned percentage and variance per package
- Current milestone, project manager, project director and due date
- Open approvals, open issues and document counts on each card
- Filters for manager, director, status, health, location, due date and progress band
Project 360
- Project header with code, status, priority, location, client or owner, area and contract value field
- Actual, planned and variance ring with a health rating and the reasons behind it
- Planned against actual S-curve, milestones in flight and next milestones
- Authority approval pipeline per authority and Municipality department stage view
- Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
Milestones and Weightage
- Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
- Weightage per milestone that rolls up to overall completion
- Portfolio delivery heatmap of every project against every trade
- Completion by milestone type and average progress per trade
- Milestone register with status, planned end, responsible engineer and overdue filter
Authority Approvals
- Statutory approval tracker for NWC, SEC and CST / Telecom
- Stages such as agreement, design approval, contractor or consultant approval and handover
- Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
- Submission date, expected date, days pending, days late, reference number and responsible engineer
- Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
Municipality and Amanah Submissions
- Submission tracker across sixteen Amanah departments, named in English and Arabic
- Four-stage workflow: submitted, audit review, revised submission and final approval
- Submission types such as technical study, design report, inspection request and handover package
- Report count, submission date, days pending and report number per submission
- Charts by workflow stage, by status and by department
Progress Updates
- Site progress log against each milestone, in timeline or table view
- Previous and new percentage kept on every entry, never overwritten
- Work description, highlighted constraint and next action
- Site photograph or note attached to the update
- Filters by project and contributor
Documents
- Central register for drawings, design submissions, authority submissions and approval letters
- Municipality reports, site photographs, meeting minutes, handover and technical reports
- Document number, version, file type, size, date and uploader
- DWG, PDF, JPG, DOCX and XLSX files with preview and download
- Card and table views with project, category and file type filters
Issues and Risks
- Portfolio issue and risk register with owner, raised date and target date
- Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
- Severity from low to critical and status from open to closed
- Overdue against target count
- Charts by severity, status and category
Reports and Analytics
- Standard PMO pack of twelve reports read live from the same records
- Project progress, milestone progress, project delay, project health and due date reports
- Project director performance and project manager portfolio reports
- Authority approval ageing, overdue approval and municipality submission reports
- Document register and issue and risk reports, filtered by director or project, with PDF and Excel export
Masters
- Projects master with code, English and Arabic name, site manager, director, dates, status, priority and milestone count
- Milestones, authorities and approval stages
- Municipality departments and managers and directors
- Status values, document categories and issue categories
Administration and Permissions
- Users with title, role and bilingual display name
- Four roles: PMO Administrator, Project Director, Project Manager and Management
- Role permission matrix across fourteen capabilities, from viewing projects to system administration
- Localisation settings for English (LTR) and Arabic (RTL)
- Demo data reset to a seeded baseline
Infrastructure PMO screens
Real screens from the live demo, shown with its Saudi set-up.
















Where it helps in the United Kingdom
Set up for your country, connected to your systems
What the product handles out of the box, and what Shyphan does to put it live in your business.
Built into the product
Delivered and supported in
Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.
How Shyphan puts it live
Infrastructure PMO in other countries
Pages written for the authorities, permits and language of each market.
Infrastructure PMO by industry
Pages written for how each industry actually works with the product.
Try the Infrastructure PMO yourself
No sign-up. The demo opens in your browser with sample data.
- Open the live demo in a new tab.
- Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
- Explore the screens freely. It is a demo company with sample data.
- Book a guided demo and we will set it up around your own process.

Infrastructure PMO in the United Kingdom: questions
Which authorities and bodies does it track in the UK?
Which languages does it support?
Does it connect to Street Manager or other authority portals?
How does set-up work for a UK portfolio?
Does it replace our programme or cost system?
Sources for the authority information on this page
- GOV.UK: Street works collection
- GOV.UK: Plan and manage roadworks (Street Manager)
- GOV.UK: Street works permit schemes statutory guidance
- DfT: Permit schemes statutory guidance 2025 (PDF)
- Wikipedia: New Roads and Street Works Act 1991
- Buckinghamshire Council: Apply for a Section 278 Agreement
- Thames Water: Adopting sewers and other assets
- NESO: Connections for domestic customers and homeowners
- National Highways: About us
- Openreach: Contracts and policies for developers

See it on your the United Kingdom portfolio
A guided demo with your authorities and milestones, then a written scope and a fixed quote.


