Infrastructure Project and Approval Management Software in Egypt

Infrastructure packages in Egypt depend on water and wastewater companies, electricity distribution companies, telecom bodies and the governorate or new city agency that issues permits. The Shyphan Infrastructure PMO keeps milestones, approvals, permits, site progress and risks for every package in one record, in English and Arabic.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Executive dashboard in Egypt
Authorities

Approvals and submissions tracked in Egypt

Authorities, approval stages and municipality departments are master data, set up for your market during implementation.

Holding Company for Water and Wastewater (HCWW) and its affiliated companiesWater and sewerage. Each submission to the affiliated company serving the governorate is logged with its stage, reference and days pending.
National Authority of Potable Water and Sewage (NOPWASD) and Construction Authority for Potable Water and Wastewater (CAPW)Water and sewerage. Where one of these bodies awards and finances the works, the owner's reviews and handover steps are tracked per package.
Electricity distribution companies of the Egyptian Electricity Holding Company (EEHC)Electricity. Application, site visit, cost report, payment and connection are held as stages, so ageing is visible.
Egyptian Electric Utility and Consumer Protection Regulatory Agency (EgyptERA)Electricity. The connection steps EgyptERA sets for distribution companies become the stages each connection moves through.
National Telecommunications Regulatory Authority (NTRA) and Telecom EgyptTelecom. Telecom approvals a package needs are logged per stage, with the responsible engineer and expected date.
General Authority for Roads, Bridges and Land Transport (GARBLT)Roads and municipality. For packages tying into roads under this Ministry of Transport authority, submissions get their own approval line.
Governorates and local administrative units (Unified Building Law No. 119 of 2008)Permits. Permit applications to the district or municipal office move through submission, audit review, revision and final approval.
New Urban Communities Authority (NUCA) and city development agenciesPermits. In new cities, the city agency's permit and utility submissions are set up as departments.
The challenge

What infrastructure teams in Egypt struggle with

Approvals spread across many bodiesOne package can wait on a water company, an electricity distribution company, a telecom body and a governorate office at once, each with its own references.
Different rules in governorates and new citiesPermits in existing cities run through local administrative units, while in new cities the city development agency issues them, so one portfolio often mixes two permit routes.
Connections that depend on site worksAn electricity connection can only follow once the cost report is paid, any transformer is provided and the implementation permits are in place, so delays in one area hold up another.
Progress reported in separate filesWhen site teams, consultants and the PMO keep separate spreadsheets, directors struggle to see actual against planned progress.
Set-up

How the Infrastructure PMO works in Egypt

  1. Configure Egyptian mastersShyphan loads your authorities, such as the HCWW affiliated company, the distribution company and the governorate or city agency, with their stages and departments.
  2. Set up each packageThe PMO creates the project with its code, location, owner, manager and director, and loads the physical milestones with their weightage, from earthworks to road marking.
  3. Register submissions from day oneEach submission is logged with its date, expected date, reference and engineer, so days pending count at once.
  4. Report progress from siteSite managers update milestone percentages with a note and photo; overall completion recalculates from the weights.
  5. Log issues, risks and documentsUtilities clashes and supply problems go into the risk register with an owner; drawings and approval letters go into the document register.
  6. Review exceptions and reportDirectors work from overdue approvals and late milestones on the dashboard, and the PMO exports standard reports to PDF or Excel.
Modules and features

Infrastructure PMO modules

12 modules in the live demo. The main ones are below with what each covers.

Executive Dashboard

  • Portfolio totals for projects, average completion against plan, critical projects, open approvals, Amanah reports and open issues
  • Portfolio progress bar chart of actual against planned baseline, with a click through to Project 360
  • Project health and project status distribution
  • Projects Requiring Attention list covering overdue approvals, schedule variance, late milestones, critical issues and approaching due dates
  • Filter by project director
See the screen

Project Portfolio

  • Card and table views of every infrastructure package under PMO monitoring
  • Overall completion, planned percentage and variance per package
  • Current milestone, project manager, project director and due date
  • Open approvals, open issues and document counts on each card
  • Filters for manager, director, status, health, location, due date and progress band
See the screen

Project 360

  • Project header with code, status, priority, location, client or owner, area and contract value field
  • Actual, planned and variance ring with a health rating and the reasons behind it
  • Planned against actual S-curve, milestones in flight and next milestones
  • Authority approval pipeline per authority and Municipality department stage view
  • Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
See the screen

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Authority Approvals

  • Statutory approval tracker for NWC, SEC and CST / Telecom
  • Stages such as agreement, design approval, contractor or consultant approval and handover
  • Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
  • Submission date, expected date, days pending, days late, reference number and responsible engineer
  • Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
See the screen

Municipality and Amanah Submissions

  • Submission tracker across sixteen Amanah departments, named in English and Arabic
  • Four-stage workflow: submitted, audit review, revised submission and final approval
  • Submission types such as technical study, design report, inspection request and handover package
  • Report count, submission date, days pending and report number per submission
  • Charts by workflow stage, by status and by department
See the screen

Progress Updates

  • Site progress log against each milestone, in timeline or table view
  • Previous and new percentage kept on every entry, never overwritten
  • Work description, highlighted constraint and next action
  • Site photograph or note attached to the update
  • Filters by project and contributor
See the screen

Documents

  • Central register for drawings, design submissions, authority submissions and approval letters
  • Municipality reports, site photographs, meeting minutes, handover and technical reports
  • Document number, version, file type, size, date and uploader
  • DWG, PDF, JPG, DOCX and XLSX files with preview and download
  • Card and table views with project, category and file type filters
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen

Reports and Analytics

  • Standard PMO pack of twelve reports read live from the same records
  • Project progress, milestone progress, project delay, project health and due date reports
  • Project director performance and project manager portfolio reports
  • Authority approval ageing, overdue approval and municipality submission reports
  • Document register and issue and risk reports, filtered by director or project, with PDF and Excel export
See the screen

Masters

  • Projects master with code, English and Arabic name, site manager, director, dates, status, priority and milestone count
  • Milestones, authorities and approval stages
  • Municipality departments and managers and directors
  • Status values, document categories and issue categories
See the screen

Administration and Permissions

  • Users with title, role and bilingual display name
  • Four roles: PMO Administrator, Project Director, Project Manager and Management
  • Role permission matrix across fourteen capabilities, from viewing projects to system administration
  • Localisation settings for English (LTR) and Arabic (RTL)
  • Demo data reset to a seeded baseline
See the screen
Product screenshots

Infrastructure PMO screens

Real screens from the live demo, shown with its Saudi set-up.

16 screens · pick one
dcc-demo.shyphan.com
Executive dashboard screen in the Infrastructure PMO
Executive dashboardPortfolio completion against plan, critical projects, open approvals, Amanah reports and project health on one screen.1 / 16
dcc-demo.shyphan.com
Project portfolio screen in the Infrastructure PMO
Project portfolioEvery package with completion, variance, current milestone, manager, director and open approvals.2 / 16
dcc-demo.shyphan.com
Project 360 screen in the Infrastructure PMO
Project 360Actual against planned progress, the health rating with its reasons and the key facts for one package.3 / 16
dcc-demo.shyphan.com
Project 360 approvals tab screen in the Infrastructure PMO
Project 360 approvals tabStage-by-stage position with NWC, SEC and CST for one package, with dates, reference numbers and days pending.4 / 16
dcc-demo.shyphan.com
Project activity history screen in the Infrastructure PMO
Project activity historyA full audit trail of milestone updates, Amanah submissions and uploads for the package.5 / 16
dcc-demo.shyphan.com
Portfolio delivery heatmap screen in the Infrastructure PMO
Portfolio delivery heatmapEvery project against all thirteen infrastructure trades, with overall weighted completion per package.6 / 16
dcc-demo.shyphan.com
Authority approvals tracker screen in the Infrastructure PMO
Authority approvals trackerApproval stages by authority with approved, review, revision and overdue counts and average ageing.7 / 16
dcc-demo.shyphan.com
Municipality and Amanah submissions screen in the Infrastructure PMO
Municipality and Amanah submissionsSubmissions by workflow stage, status and Amanah department, with overdue responses counted.8 / 16
dcc-demo.shyphan.com
Progress update log screen in the Infrastructure PMO
Progress update logSite updates with previous and new percentage, constraint, next action and attached site photo.9 / 16
dcc-demo.shyphan.com
Document register screen in the Infrastructure PMO
Document registerDrawings, design submissions, authority packages and minutes with document number and version.10 / 16
dcc-demo.shyphan.com
Issues and risks screen in the Infrastructure PMO
Issues and risksOpen issues by severity, status and category, with overdue against target date.11 / 16
dcc-demo.shyphan.com
Reports and analytics screen in the Infrastructure PMO
Reports and analyticsThe standard PMO reporting pack with PDF and Excel export, filtered by director or project.12 / 16
dcc-demo.shyphan.com
Masters screen in the Infrastructure PMO
MastersConfiguration data for projects, milestones, authorities, approval stages and Amanah departments.13 / 16
dcc-demo.shyphan.com
Role permission matrix screen in the Infrastructure PMO
Role permission matrixFour roles and what each can view, update and manage across the platform.14 / 16
dcc-demo.shyphan.com
Arabic executive dashboard screen in the Infrastructure PMO
Arabic executive dashboardThe same dashboard in Arabic with a full right-to-left layout.15 / 16
dcc-demo.shyphan.com
Arabic approvals tracker screen in the Infrastructure PMO
Arabic approvals trackerThe authority approvals screen in Arabic, with authority names shown in both languages.16 / 16
Use cases

Where it helps in Egypt

Developers in new citiesTrack city agency permits, utility connections and progress across plots or phases in one view.
Contractors on water and wastewater packagesFollow owner reviews, network milestones and handover steps for packages awarded by NOPWASD, CAPW or an affiliated water company.
PMO teams on mixed urban packagesKeep roads, electricity, telecom and drainage approvals for each package in one tracker, with ageing and escalation for overdue items.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO in Egypt: questions

Which authorities does it track in Egypt?
Authorities are master data, so Shyphan configures the bodies your packages use: typically HCWW affiliated companies, NOPWASD or CAPW, EEHC distribution companies, NTRA and Telecom Egypt, GARBLT, and governorate offices or NUCA city agencies.
Is the system available in Arabic?
Yes. Users can switch the whole interface between English and Arabic, and the Arabic view uses a full right-to-left layout. Authority names, departments and milestones can be held in both languages.
Does it connect to authority portals or the permit systems?
No. It does not connect to any authority portal. The PMO records each submission, the reference number, the dates and the response, so the tracker shows where every approval stands. Integration with a specific portal can be scoped separately if you need it.
How does set-up work for an Egyptian portfolio?
Shyphan runs a short discovery session, then configures authorities, approval stages, permit departments, milestones and weightage for your packages. Existing Excel trackers can be loaded and checked with your PMO before go-live, and 24/7 support follows after launch.
Does it handle BOQs, budgets or payment certificates?
No. It tracks delivery and approvals only; there are no BOQs, budgets, invoices or payment certificates. An ERP link can be a separate piece of work.
Two people working on laptops at a desk
Get started

See it on your Egypt portfolio

A guided demo with your authorities and milestones, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn