WhatsApp

Request A Quote

Follow Us On:

Home / Industries / Contracting ERP

Specialized Contracting · Contracting ERP

Rope Access and Work at Height Contractor Software

Rope access work is only as safe as the controls behind it. This software checks for a Level 3 supervisor, an approved rescue plan, approved RAMS and an active permit before a project is authorised, and keeps crew certificates and life-safety kit under the same watch. Supervisors report from site on a phone, and managers see every project's status live.

Prefer to talk? Call +91 95651 53545
18modules
13user roles
العربية

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Contracting ERP on your own process.

Your details stay private and are never shared.

wproofing.shyphan.com
Project workspace for specialized contracting
The challenge

What specialized contracting businesses struggle with

Supervisor cover on every crewA crew without an IRATA Level 3 supervisor should never start, but rosters change daily and gaps are easy to miss.
Rescue plans written too lateSite-specific rescue plans are often drafted after mobilisation, leaving crews on ropes without an approved plan.
Certificates and kit out of dateIRATA tickets, first aid cards and equipment inspections expire on different dates and are tracked in separate places.
Wind and weather downtimeHigh wind stops work at height, and unrecorded downtime turns into disputes over progress and billing.
Workflow

The specialized contracting workflow in the Contracting ERP

  1. Survey and methodThe survey records height, access method and anchors, and the project gets a site-specific risk assessment, method statement and rescue plan.
  2. Crew from the matrixThe workforce coordinator assigns technicians who hold the right IRATA level, competencies and in-date certificates.
  3. Permit and authorisationA permit is requested and briefed to the crew. The project shows Authorised only when every control passes.
  4. Work and daily reportThe supervisor logs drops or quantities, crew hours, wind, downtime, photos and safety notes on the field app.
  5. Stop work and close-outAnyone can raise a stop-work order or report an incident, and the project closes with its permits handed back.
Modules and features

Modules specialized contracting teams use

5 modules in the live demo. The main ones are below with what each covers.

Project Operations

  • Project portfolio with health, progress against plan, value and forecast margin
  • Project workspace with plan, team, equipment, safety, costs, billing and closeout tabs
  • Live work authorisation check and stop-work control
  • Daily progress reports with crew, quantities, downtime, wind and client acknowledgement
  • Weekly timesheets with overtime and approval, and a variations register
See the screen

Field Capture App

  • Mobile capture per project and WBS element
  • Crew attendance with normal and overtime hours
  • Quantities, downtime, weather, temperature and wind speed
  • Up to six photos per report and safety notes
  • Kit check, safety tab, draft saving and sync status

Workforce

  • Employee directory with IRATA level and base
  • Certificate register with 60-day expiry alerts and renewal
  • Competency matrix across twelve service skills
  • Availability, assignments and leave records
  • Manpower rental requests matched, mobilised and billed
See the screen

Equipment

  • Life-safety equipment passports with serial, custodian, project and location
  • Status that turns unissuable on the inspection due date or service life expiry
  • Inspection schedule and inspection log with outcomes and findings
  • Maintenance and quarantine, plus recalls
See the screen

HSE and Quality

  • HSE dashboard with days since last lost-time incident, permits and observations
  • Permits to work for work at height, confined space and lifting
  • Site-specific risk assessments and method statements with versions
  • Rescue plans required before permits or work authorisation
  • Safety observations, incidents and investigations, and a stop-work button
See the screen
Product screenshots

Specialized Contracting screens

Real screens from the live demo that matter most for this industry.

3 screens · pick one
wproofing.shyphan.com
Project workspace screen in the Contracting ERP
Project workspaceKey facts, certified progress and the live work authorisation checklist for one project.1 / 3
wproofing.shyphan.com
Competency matrix screen in the Contracting ERP
Competency matrixWho is competent in which service skill, grouped by IRATA level, with coverage by skill.2 / 3
wproofing.shyphan.com
Permits to work screen in the Contracting ERP
Permits to workWork at height, confined space and lifting permits with validity, briefing and status.3 / 3
Assistant and automation

Assistant and automation in the Contracting ERP for specialized contracting

The built-in assistant and the rules that do the routine checking for your team.

wproofing.shyphan.com
AI assistant in the Contracting ERP
Assistant on live platform dataAsk what needs attention today, who is available with IRATA Level 3 or which equipment is due for inspection. Answers respect the user's role and link to the records. In the demo the answers are produced by built-in rules over platform data.
Insights CentreFourteen rules scan projects, crews, equipment and finance for gaps such as a missing rescue plan or a crew without a Level 3 supervisor. Each finding shows its evidence and a recommended action, and nothing happens until a person accepts it.
Approval routingQuotes, billing, purchases and timesheets route through a delegation-of-authority matrix with segregation of duties, so nobody approves their own submission.
Use cases

Where it helps specialized contracting teams

Crew change mid-projectA Level 3 supervisor goes on leave. The insights flag the crew gap and the coordinator assigns an available, certified replacement before work continues.
Rescue plan approvalA new stadium roof project is mobilising. Permits stay blocked until the HSE manager approves the rescue plan and briefs the crew.
Overdue descenderA descender passes its inspection due date and becomes unissuable automatically, so the store cannot send it to site.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
English
Tax and compliance
VAT (amounts shown excluding and including VAT, VAT and CR numbers on legal entities)
Currencies
SAR
Integrations
Zoho BooksHR system and biometric attendance

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Industries

More industries the Contracting ERP serves

Pages written for how each industry actually works with the product.

Live demo

Try the Contracting ERP yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo, choose a role from the account list on the sign-in screen and click Sign in
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
wproofing.shyphan.com
Sign-in screen of the Contracting ERP live demo
FAQ

Contracting ERP for specialized contracting: questions

Does the software track IRATA levels?
Yes. Every technician carries an IRATA level, and certificates for IRATA, first aid, H2S and other tickets are tracked with alerts from 60 days before expiry. An expired IRATA certificate blocks deployment.
Can a project start without a rescue plan?
No. Permit approval and work authorisation are blocked until the project has an approved, site-specific rescue plan. In the demo this rule has no override.
How does equipment inspection work?
Each harness, rope, descender or connector has a passport with serial, custodian and next inspection date. It becomes unissuable on that date or at service life expiry, and quarantined items stay out of use until inspected.
Can supervisors report from site without signal?
The field app saves reports on the device and shows their sync status, and the office can filter reports that are still on the device and not yet synced.
Can we add our own permit types or checks?
Yes. The demo includes work at height, confined space and lifting permits, and Shyphan can add permit types, checklist items and authorisation rules during implementation.
Two people working on laptops at a desk
Get started

See it on your specialized contracting process

A guided demo on your own workflow, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn