Home / Products / Infrastructure PMO

Qatar · Infrastructure PMO

Infrastructure Project and Approval Management Software in Qatar

Roads, drainage, power and water work in Qatar runs through Ashghal, KAHRAMAA and the Ministry of Municipality, each with its own permits and reviews. Shyphan's Infrastructure PMO tracks those approvals stage by stage next to weighted milestones, site updates, documents and risks, in English and Arabic.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Executive dashboard in Qatar
Authorities

Approvals and submissions tracked in Qatar

Authorities, approval stages and municipality departments are master data, set up for your market during implementation.

Public Works Authority (Ashghal)Roads and municipality. Permits for excavation, road diversions or closures and utility line works in the road corridor, traffic diversion plan approvals and dewatering permits, each with submission date and status.
Qatar General Electricity and Water Corporation (KAHRAMAA)Electricity. Electricity and water applications lodged at the KAHRAMAA centre in the Building Permit Complex and later connection stages, tracked with days pending.
Ministry of MunicipalityPermits. Building permit submissions through the Building Permits Complex and its electronic system, logged as municipality stages.
General Directorate of Civil DefencePermits. Civil Defence design approvals coordinated through the building permit process, held as their own approval stage.
Communications Regulatory Authority (CRA)Telecom. Telecom infrastructure design coordination with service providers against the CRA building standards, tracked as stages the PMO defines.
The challenge

What infrastructure teams in Qatar struggle with

Road corridor permits per packageAshghal grants permits for excavation, road diversions, utility line works and occupancy of the right of way, so a single package can carry several permits with different owners.
Traffic diversion plans before workDiversion plans must be approved before works start. When that approval is late, the whole milestone sequence slips without anyone flagging why.
Utility approvals tied to the building permitKAHRAMAA electricity and water applications are lodged at the Building Permit Complex, so delays in one office show up as delays in another.
Telecom design rules changedThe CRA issued mandatory building telecom standards in 2025 that ask developers to work with service providers early, which adds a stage many trackers do not have.
Set-up

How the Infrastructure PMO works in Qatar

  1. Configure Qatar mastersShyphan sets up Ashghal, KAHRAMAA, the Ministry of Municipality, Civil Defence and telecom stages, with Arabic names for every authority and status.
  2. Create packages and milestonesEach package gets its code, location, owner and dates, plus weighted milestones for earthworks, storm and sewage, water, MV electricity, telecom, roads and lighting.
  3. Register permits and approvalsRoad opening permits, diversion plans, dewatering permits and KAHRAMAA applications are logged with reference numbers and expected dates, so ageing buckets fill automatically.
  4. Update progress from siteSite managers record new percentages with photos, constraints and next actions, and earlier values stay in the history.
  5. Manage issues and documentsUtilities clashes, pending inspections and supply problems go into the risk register, and approval letters and drawings go into the document register.
  6. Report exceptionsDirectors see overdue approvals, late milestones and critical issues on the dashboard, and the PMO exports the standard reports to PDF or Excel.
Modules and features

Infrastructure PMO modules

12 modules in the live demo. The main ones are below with what each covers.

Executive Dashboard

  • Portfolio totals for projects, average completion against plan, critical projects, open approvals, Amanah reports and open issues
  • Portfolio progress bar chart of actual against planned baseline, with a click through to Project 360
  • Project health and project status distribution
  • Projects Requiring Attention list covering overdue approvals, schedule variance, late milestones, critical issues and approaching due dates
  • Filter by project director
See the screen

Project Portfolio

  • Card and table views of every infrastructure package under PMO monitoring
  • Overall completion, planned percentage and variance per package
  • Current milestone, project manager, project director and due date
  • Open approvals, open issues and document counts on each card
  • Filters for manager, director, status, health, location, due date and progress band
See the screen

Project 360

  • Project header with code, status, priority, location, client or owner, area and contract value field
  • Actual, planned and variance ring with a health rating and the reasons behind it
  • Planned against actual S-curve, milestones in flight and next milestones
  • Authority approval pipeline per authority and Municipality department stage view
  • Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
See the screen

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Authority Approvals

  • Statutory approval tracker for NWC, SEC and CST / Telecom
  • Stages such as agreement, design approval, contractor or consultant approval and handover
  • Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
  • Submission date, expected date, days pending, days late, reference number and responsible engineer
  • Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
See the screen

Municipality and Amanah Submissions

  • Submission tracker across sixteen Amanah departments, named in English and Arabic
  • Four-stage workflow: submitted, audit review, revised submission and final approval
  • Submission types such as technical study, design report, inspection request and handover package
  • Report count, submission date, days pending and report number per submission
  • Charts by workflow stage, by status and by department
See the screen

Progress Updates

  • Site progress log against each milestone, in timeline or table view
  • Previous and new percentage kept on every entry, never overwritten
  • Work description, highlighted constraint and next action
  • Site photograph or note attached to the update
  • Filters by project and contributor
See the screen

Documents

  • Central register for drawings, design submissions, authority submissions and approval letters
  • Municipality reports, site photographs, meeting minutes, handover and technical reports
  • Document number, version, file type, size, date and uploader
  • DWG, PDF, JPG, DOCX and XLSX files with preview and download
  • Card and table views with project, category and file type filters
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen

Reports and Analytics

  • Standard PMO pack of twelve reports read live from the same records
  • Project progress, milestone progress, project delay, project health and due date reports
  • Project director performance and project manager portfolio reports
  • Authority approval ageing, overdue approval and municipality submission reports
  • Document register and issue and risk reports, filtered by director or project, with PDF and Excel export
See the screen

Masters

  • Projects master with code, English and Arabic name, site manager, director, dates, status, priority and milestone count
  • Milestones, authorities and approval stages
  • Municipality departments and managers and directors
  • Status values, document categories and issue categories
See the screen

Administration and Permissions

  • Users with title, role and bilingual display name
  • Four roles: PMO Administrator, Project Director, Project Manager and Management
  • Role permission matrix across fourteen capabilities, from viewing projects to system administration
  • Localisation settings for English (LTR) and Arabic (RTL)
  • Demo data reset to a seeded baseline
See the screen
Product screenshots

Infrastructure PMO screens

Real screens from the live demo, shown with its Saudi set-up.

16 screens · pick one
dcc-demo.shyphan.com
Executive dashboard screen in the Infrastructure PMO
Executive dashboardPortfolio completion against plan, critical projects, open approvals, Amanah reports and project health on one screen.1 / 16
dcc-demo.shyphan.com
Project portfolio screen in the Infrastructure PMO
Project portfolioEvery package with completion, variance, current milestone, manager, director and open approvals.2 / 16
dcc-demo.shyphan.com
Project 360 screen in the Infrastructure PMO
Project 360Actual against planned progress, the health rating with its reasons and the key facts for one package.3 / 16
dcc-demo.shyphan.com
Project 360 approvals tab screen in the Infrastructure PMO
Project 360 approvals tabStage-by-stage position with NWC, SEC and CST for one package, with dates, reference numbers and days pending.4 / 16
dcc-demo.shyphan.com
Project activity history screen in the Infrastructure PMO
Project activity historyA full audit trail of milestone updates, Amanah submissions and uploads for the package.5 / 16
dcc-demo.shyphan.com
Portfolio delivery heatmap screen in the Infrastructure PMO
Portfolio delivery heatmapEvery project against all thirteen infrastructure trades, with overall weighted completion per package.6 / 16
dcc-demo.shyphan.com
Authority approvals tracker screen in the Infrastructure PMO
Authority approvals trackerApproval stages by authority with approved, review, revision and overdue counts and average ageing.7 / 16
dcc-demo.shyphan.com
Municipality and Amanah submissions screen in the Infrastructure PMO
Municipality and Amanah submissionsSubmissions by workflow stage, status and Amanah department, with overdue responses counted.8 / 16
dcc-demo.shyphan.com
Progress update log screen in the Infrastructure PMO
Progress update logSite updates with previous and new percentage, constraint, next action and attached site photo.9 / 16
dcc-demo.shyphan.com
Document register screen in the Infrastructure PMO
Document registerDrawings, design submissions, authority packages and minutes with document number and version.10 / 16
dcc-demo.shyphan.com
Issues and risks screen in the Infrastructure PMO
Issues and risksOpen issues by severity, status and category, with overdue against target date.11 / 16
dcc-demo.shyphan.com
Reports and analytics screen in the Infrastructure PMO
Reports and analyticsThe standard PMO reporting pack with PDF and Excel export, filtered by director or project.12 / 16
dcc-demo.shyphan.com
Masters screen in the Infrastructure PMO
MastersConfiguration data for projects, milestones, authorities, approval stages and Amanah departments.13 / 16
dcc-demo.shyphan.com
Role permission matrix screen in the Infrastructure PMO
Role permission matrixFour roles and what each can view, update and manage across the platform.14 / 16
dcc-demo.shyphan.com
Arabic executive dashboard screen in the Infrastructure PMO
Arabic executive dashboardThe same dashboard in Arabic with a full right-to-left layout.15 / 16
dcc-demo.shyphan.com
Arabic approvals tracker screen in the Infrastructure PMO
Arabic approvals trackerThe authority approvals screen in Arabic, with authority names shown in both languages.16 / 16
Use cases

Where it helps in Qatar

Roads and drainage contractorAshghal permits, diversion plans and dewatering permits are tracked per package with days late, so the site team knows what blocks the next trade.
Developer of a mixed use districtBuilding permit, KAHRAMAA and Civil Defence stages sit beside milestone progress for every plot and road package.
PMO consultantOne reporting pack covers progress against plan, approval ageing and open risks across all packages under supervision.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO in Qatar: questions

Which Qatar authorities does the PMO track?
It is usually set up for Ashghal, KAHRAMAA, the Ministry of Municipality and Civil Defence, plus telecom stages for your service provider. Authorities and stages are master data, so others can be added.
Is the system available in Arabic?
Yes. The whole interface switches between English and Arabic, with a full right to left layout and Arabic names for authorities, milestones and statuses.
Does it connect to the Ashghal Customer Zone or KAHRAMAA e-services?
No. The platform does not connect to any authority portal. Your team keeps filing in the official systems, then records the submission date, reference number, status and response in the PMO so ageing and escalation work. A link to a portal can be scoped as separate work if you need one.
How does set up work for Qatar?
Shyphan reviews your current trackers, configures the Qatar authorities, stages, milestones and weights, migrates open approvals and issues, then trains your PMO and site teams. Support runs 24/7 after go live.
Can we change the milestones and weights?
Yes. The PMO manages milestones and weightage, so the trades can match your scope, for example adding drainage or lighting packages.
Two people working on laptops at a desk
Get started

See it on your Qatar portfolio

A guided demo with your authorities and milestones, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn