WhatsApp

Request A Quote

Follow Us On:

Home / Products / Infrastructure PMO

UAE · Infrastructure PMO

Infrastructure Project and Approval Management Software in the UAE

Infrastructure packages in Dubai and Abu Dhabi depend on approvals from utilities, road authorities and municipalities that each run their own system. Shyphan's Infrastructure PMO keeps milestones, authority submissions, site updates and risks in one record per package, set up for your emirate.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Executive dashboard in the United Arab Emirates
Authorities

Approvals and submissions tracked in the United Arab Emirates

Authorities, approval stages and municipality departments are master data, set up for your market during implementation.

Dubai Electricity and Water Authority (DEWA)Electricity. Electricity and water NOCs for building permits, filed through the Dubai Building Permit System or on DEWA's website for free zone and Trakhees projects.
Roads and Transport Authority (RTA)Roads and municipality. Right of Way NOCs for excavation and utility lines, related permits such as traffic diversions, and the clearance certificate after works, each tracked as its own stage.
Dubai Municipality (DM)Permits. Building permit submissions and Right of Way plan approvals held as municipality stages with days pending per department.
Emirates Integrated Telecommunications Company (du)Telecom. OSP or civil infrastructure NOCs and building NOCs, their validity dates, resubmissions after drawing changes and duct handover ahead of service.
Etisalat by e& (e&)Telecom. Telecom design reviews and duct handover where e& serves the project, set up as stages your PMO defines.
TAQA DistributionElectricity. Electricity and water network approvals and connection stages in Abu Dhabi, under the company formed from ADDC and AADC.
TAQA Water SolutionsWater and sewerage. Sewerage related approvals in Abu Dhabi with the company formerly known as Abu Dhabi Sewerage Services Company.
Department of Municipalities and Transport (DMT)Roads and municipality. Building permit and municipality submissions to Abu Dhabi City, Al Ain City and Al Dhafra Region municipalities, tracked by stage.
The challenge

What infrastructure teams in the United Arab Emirates struggle with

Two emirates, two sets of bodiesA developer in Dubai and Abu Dhabi deals with DEWA, RTA and Dubai Municipality in one emirate and TAQA Distribution and DMT in the other.
NOCs that expireAn RTA Right of Way NOC is valid for six months and du NOCs carry their own validity, so a late start on site can mean a renewal nobody planned for.
Drawing changes reset approvalsdu states that any change to approved drawings invalidates the NOC. Without a record of what was approved and when, resubmissions are easy to miss.
Close out gets forgottenDubai's Right of Way rules ask for a clearance certificate application within thirty days of finishing permit works, a step that often sits outside the main tracker.
Set-up

How the Infrastructure PMO works in the United Arab Emirates

  1. Configure the emirateShyphan loads the authorities, approval stages and municipality departments for Dubai, Abu Dhabi or both into the masters, in English and Arabic.
  2. Set up each packageThe PMO creates the project with its location, director and dates and loads the weighted milestones, from earthworks to road marking.
  3. Log every submissionEach DEWA, RTA, du, e&, TAQA Distribution or municipality stage is entered with submission date, expected date, reference number and responsible engineer, so ageing starts on day one.
  4. Track validity and resubmissionsRevision required, resubmitted and approved statuses show which NOCs went back for changes, and the document register keeps the approved drawings and letters.
  5. Report from siteSite managers post milestone percentages with photos and constraints. Previous values are kept and overall completion recalculates from the weights.
  6. Close out and reportClearance and handover stages stay open until done, and the PMO exports the standard reports to PDF or Excel for steering meetings.
Modules and features

Infrastructure PMO modules

12 modules in the live demo. The main ones are below with what each covers.

Executive Dashboard

  • Portfolio totals for projects, average completion against plan, critical projects, open approvals, Amanah reports and open issues
  • Portfolio progress bar chart of actual against planned baseline, with a click through to Project 360
  • Project health and project status distribution
  • Projects Requiring Attention list covering overdue approvals, schedule variance, late milestones, critical issues and approaching due dates
  • Filter by project director
See the screen

Project Portfolio

  • Card and table views of every infrastructure package under PMO monitoring
  • Overall completion, planned percentage and variance per package
  • Current milestone, project manager, project director and due date
  • Open approvals, open issues and document counts on each card
  • Filters for manager, director, status, health, location, due date and progress band
See the screen

Project 360

  • Project header with code, status, priority, location, client or owner, area and contract value field
  • Actual, planned and variance ring with a health rating and the reasons behind it
  • Planned against actual S-curve, milestones in flight and next milestones
  • Authority approval pipeline per authority and Municipality department stage view
  • Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
See the screen

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Authority Approvals

  • Statutory approval tracker for NWC, SEC and CST / Telecom
  • Stages such as agreement, design approval, contractor or consultant approval and handover
  • Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
  • Submission date, expected date, days pending, days late, reference number and responsible engineer
  • Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
See the screen

Municipality and Amanah Submissions

  • Submission tracker across sixteen Amanah departments, named in English and Arabic
  • Four-stage workflow: submitted, audit review, revised submission and final approval
  • Submission types such as technical study, design report, inspection request and handover package
  • Report count, submission date, days pending and report number per submission
  • Charts by workflow stage, by status and by department
See the screen

Progress Updates

  • Site progress log against each milestone, in timeline or table view
  • Previous and new percentage kept on every entry, never overwritten
  • Work description, highlighted constraint and next action
  • Site photograph or note attached to the update
  • Filters by project and contributor
See the screen

Documents

  • Central register for drawings, design submissions, authority submissions and approval letters
  • Municipality reports, site photographs, meeting minutes, handover and technical reports
  • Document number, version, file type, size, date and uploader
  • DWG, PDF, JPG, DOCX and XLSX files with preview and download
  • Card and table views with project, category and file type filters
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen

Reports and Analytics

  • Standard PMO pack of twelve reports read live from the same records
  • Project progress, milestone progress, project delay, project health and due date reports
  • Project director performance and project manager portfolio reports
  • Authority approval ageing, overdue approval and municipality submission reports
  • Document register and issue and risk reports, filtered by director or project, with PDF and Excel export
See the screen

Masters

  • Projects master with code, English and Arabic name, site manager, director, dates, status, priority and milestone count
  • Milestones, authorities and approval stages
  • Municipality departments and managers and directors
  • Status values, document categories and issue categories
See the screen

Administration and Permissions

  • Users with title, role and bilingual display name
  • Four roles: PMO Administrator, Project Director, Project Manager and Management
  • Role permission matrix across fourteen capabilities, from viewing projects to system administration
  • Localisation settings for English (LTR) and Arabic (RTL)
  • Demo data reset to a seeded baseline
See the screen
Product screenshots

Infrastructure PMO screens

Real screens from the live demo, shown with its Saudi set-up.

16 screens · pick one
dcc-demo.shyphan.com
Executive dashboard screen in the Infrastructure PMO
Executive dashboardPortfolio completion against plan, critical projects, open approvals, Amanah reports and project health on one screen.1 / 16
dcc-demo.shyphan.com
Project portfolio screen in the Infrastructure PMO
Project portfolioEvery package with completion, variance, current milestone, manager, director and open approvals.2 / 16
dcc-demo.shyphan.com
Project 360 screen in the Infrastructure PMO
Project 360Actual against planned progress, the health rating with its reasons and the key facts for one package.3 / 16
dcc-demo.shyphan.com
Project 360 approvals tab screen in the Infrastructure PMO
Project 360 approvals tabStage-by-stage position with NWC, SEC and CST for one package, with dates, reference numbers and days pending.4 / 16
dcc-demo.shyphan.com
Project activity history screen in the Infrastructure PMO
Project activity historyA full audit trail of milestone updates, Amanah submissions and uploads for the package.5 / 16
dcc-demo.shyphan.com
Portfolio delivery heatmap screen in the Infrastructure PMO
Portfolio delivery heatmapEvery project against all thirteen infrastructure trades, with overall weighted completion per package.6 / 16
dcc-demo.shyphan.com
Authority approvals tracker screen in the Infrastructure PMO
Authority approvals trackerApproval stages by authority with approved, review, revision and overdue counts and average ageing.7 / 16
dcc-demo.shyphan.com
Municipality and Amanah submissions screen in the Infrastructure PMO
Municipality and Amanah submissionsSubmissions by workflow stage, status and Amanah department, with overdue responses counted.8 / 16
dcc-demo.shyphan.com
Progress update log screen in the Infrastructure PMO
Progress update logSite updates with previous and new percentage, constraint, next action and attached site photo.9 / 16
dcc-demo.shyphan.com
Document register screen in the Infrastructure PMO
Document registerDrawings, design submissions, authority packages and minutes with document number and version.10 / 16
dcc-demo.shyphan.com
Issues and risks screen in the Infrastructure PMO
Issues and risksOpen issues by severity, status and category, with overdue against target date.11 / 16
dcc-demo.shyphan.com
Reports and analytics screen in the Infrastructure PMO
Reports and analyticsThe standard PMO reporting pack with PDF and Excel export, filtered by director or project.12 / 16
dcc-demo.shyphan.com
Masters screen in the Infrastructure PMO
MastersConfiguration data for projects, milestones, authorities, approval stages and Amanah departments.13 / 16
dcc-demo.shyphan.com
Role permission matrix screen in the Infrastructure PMO
Role permission matrixFour roles and what each can view, update and manage across the platform.14 / 16
dcc-demo.shyphan.com
Arabic executive dashboard screen in the Infrastructure PMO
Arabic executive dashboardThe same dashboard in Arabic with a full right-to-left layout.15 / 16
dcc-demo.shyphan.com
Arabic approvals tracker screen in the Infrastructure PMO
Arabic approvals trackerThe authority approvals screen in Arabic, with authority names shown in both languages.16 / 16
Use cases

Where it helps in the United Arab Emirates

Master developer with Dubai and Abu Dhabi communitiesOne portfolio dashboard shows packages in both emirates, with each package tracking the authority set for its location.
Utilities contractor working in the Right of WayRTA NOCs, permits, du and e& telecom stages and the final clearance certificate are tracked per package with days pending and days late.
PMO consultant reporting to a government clientWeekly reports on progress, overdue approvals and open risks come from the records site teams update.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO in the United Arab Emirates: questions

Which UAE authorities does the PMO track?
In Dubai it is typically set up for DEWA, RTA, Dubai Municipality, du and e&. In Abu Dhabi it is set up for TAQA Distribution, TAQA Water Solutions and the DMT municipalities. Authorities and stages are master data, so the PMO can add free zone or master developer bodies as needed.
Is it available in Arabic?
Yes. Users switch the whole interface between English and Arabic, and the Arabic view uses a full right to left layout with Arabic names for authorities, departments and statuses.
Does it connect to the RTA, DEWA or TAMM portals?
No. The platform does not connect to any authority portal. Your team keeps filing in the official systems, then records the submission date, reference number, status and response in the PMO so ageing and escalation work. A link to a portal can be scoped as separate work if you need one.
How does set up work in the UAE?
Shyphan runs a short discovery with your PMO, configures the authorities, stages, milestones and weights for your emirate, loads existing trackers, then trains your teams. Shyphan's Ras Al Khaimah office and 24/7 support cover the rollout.
Does it handle costs or payment certificates?
No. It tracks delivery and approvals. A contract value field sits on each project, but there are no BOQs, budgets or payment certificates.
Two people working on laptops at a desk
Get started

See it on your the United Arab Emirates portfolio

A guided demo with your authorities and milestones, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn