WhatsApp

Request A Quote

Follow Us On:

Home / Industries / Infrastructure PMO

Utility Network Contractors · Infrastructure PMO

Project Tracking Software for Utility Network Contractors

Water, sewage, storm, MV and telecom networks each need their own authority approvals and inspections before trenches can be backfilled or cables energised. This platform tracks each network as a weighted milestone, follows NWC, SEC and CST stages with days pending, and keeps a site log of tests, inspections and constraints against every package.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages
العربية

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Authority approvals tracker for utility network contractors
The challenge

What utility network contractors businesses struggle with

Inspections hold up backfillingA completed trench cannot be closed until the authority inspection is confirmed, and requests can wait for weeks.
Approvals block cable pullingAn overdue SEC design or contractor approval stops MV work even when crews and materials are ready.
Clashes with existing servicesExisting ducts and pipes found on the alignment need a diversion design before excavation can continue.
Tests and witness records scatteredPressure tests, trial runs and witnessed cable tests are reported by message and are hard to find later.
Workflow

The utility network contractors workflow in the Infrastructure PMO

  1. Weight each networkStorm, sewage and water, MV, telecom and street lighting are set up as milestones with their own weightage.
  2. Submit to the authorityNWC, SEC and CST stages are registered with reference numbers, expected dates and a responsible engineer.
  3. Log tests and progressSite teams record pressure tests, trial runs and witnessed cable tests as progress updates with photos.
  4. Raise constraintsPending inspections and utilities clashes are logged as issues with an owner and target date.
  5. Chase the oldest firstThe approval tracker sorts open stages by escalation priority so the most overdue submission is chased first.
Modules and features

Modules utility network contractors teams use

4 modules in the live demo. The main ones are below with what each covers.

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Authority Approvals

  • Statutory approval tracker for NWC, SEC and CST / Telecom
  • Stages such as agreement, design approval, contractor or consultant approval and handover
  • Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
  • Submission date, expected date, days pending, days late, reference number and responsible engineer
  • Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
See the screen

Progress Updates

  • Site progress log against each milestone, in timeline or table view
  • Previous and new percentage kept on every entry, never overwritten
  • Work description, highlighted constraint and next action
  • Site photograph or note attached to the update
  • Filters by project and contributor
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen
Product screenshots

Utility Network Contractors screens

Real screens from the live demo that matter most for this industry.

3 screens · pick one
dcc-demo.shyphan.com
Project 360 approvals tab screen in the Infrastructure PMO
Project 360 approvals tabStage-by-stage position with NWC, SEC and CST for one package, with dates, reference numbers and days pending.1 / 3
dcc-demo.shyphan.com
Authority approvals tracker screen in the Infrastructure PMO
Authority approvals trackerApproval stages by authority with approved, review, revision and overdue counts and average ageing.2 / 3
dcc-demo.shyphan.com
Progress update log screen in the Infrastructure PMO
Progress update logSite updates with previous and new percentage, constraint, next action and attached site photo.3 / 3
Automation

Automation in the Infrastructure PMO for utility network contractors

Rules and alerts in the live demo that do the routine checking for your team.

Rule-based project healthEach project is rated On Track, Attention Required, Delayed or Critical from its variance, overdue approvals and critical issues, and the reasons are listed on Project 360. These are built-in rules, not AI.
Overdue and ageing detectionApproval stages and Amanah submissions are flagged as overdue once they pass their expected date, with days pending and days late calculated and grouped into ageing buckets automatically.
Attention listThe platform collects every open condition that puts a project at risk, such as a late milestone, an overdue approval or a due date 60 days away, and ranks them by severity. This is rule-based automation, not AI.
Use cases

Where it helps utility network contractors teams

Pending NWC inspectionThe water network trench is complete but the NWC inspection date is not confirmed. The issue is logged, the next update records the constraint, and the PMO follows up with the authority.
MV cable testingSEC witnesses MV cable testing on the first loop. The site manager records it as a progress update and the MV milestone moves forward.
Telecom duct clashAn existing telecom duct crosses the storm line. A utilities clash is raised with a target date while the diversion design is prepared.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO for utility network contractors: questions

Which utility authorities are included?
The demo includes NWC for water and sewage, SEC for electricity and CST / Telecom. Each has its own stages, such as agreement, design approval, contractor or consultant approval and handover.
Can we see how long each approval has been pending?
Yes. Every open stage shows its submission date, expected date, days pending and days late, and an ageing profile groups open stages into 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ days.
Can we record test results?
Tests and inspections are recorded as progress updates with a description and attached photo or note. A dedicated test certificate register is not part of the demo and would be added during implementation if needed.
Does it track utilities clashes?
Yes. Utilities clash is a standard issue category, with severity, owner, raised date and target resolution date.
Can site engineers update progress from a phone?
Yes. The interface works on a phone with bottom navigation for projects, approvals and Amanah, and a quick button to update progress.
Two people working on laptops at a desk
Get started

See it on your utility network contractors process

A guided demo on your own workflow, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn