Case study · Infrastructure construction

Dahlawi Construction Co.

One PMO command centre for a Saudi infrastructure contractor: portfolio progress, physical milestones, NWC, SEC and CST approvals and every Amanah submission.

Industry
Infrastructure construction
Location
Saudi Arabia
Apps
2 connected apps
Scope
6-step process
Products used
Services
Custom web platform developmentArabic and English (RTL) interfaceSystem integration
At a glance
Portfolio progress against plan in one dashboard
Every NWC, SEC and CST approval tracked by stage
Amanah submissions followed through four stages
At-risk projects flagged with the reason and owner
The challenge

What Dahlawi Construction Co. needed to fix

Dahlawi Construction Co. (DCC) is a Saudi construction company working since 1976. It delivers turn-key infrastructure projects for public and private sector clients, from project inception to completion.

Each infrastructure package moves through a dozen physical trades and depends on statutory approvals from several authorities and municipality departments. The PMO, project directors and management needed one live view of where every package, approval and submission stands.

  1. Progress spread across sitesPhysical progress for backfilling, utilities, asphalt, street lights and other trades sat with each site team, so portfolio completion against plan was hard to see.
  2. Authority approvals by stageNWC, SEC and CST / Telecom approvals each run through design, contractor, agreement and handover stages, and overdue stages were easy to miss.
  3. Amanah submissionsReports to many Amanah and municipality departments go through submission, audit review, revision and final approval, with responses to chase.
  4. Risk and accountabilityManagement needed to see which projects were at risk, why, and who was responsible for the next action.
Engineers in hard hats inspecting work on a construction site
Engineers in hard hats inspecting work on a construction site. Photo credit
Before and after

What changed for the team

BeforeAfter

Site progress reported separately by each team

Weighted milestone progress rolls up into one portfolio view

Authority approval stages easy to lose track of

NWC, SEC and CST stages tracked with ageing and overdue alerts

Amanah submissions chased by email and phone

Four-stage submission workflow per municipality department

Risk visible only in meetings

Projects requiring attention listed with condition, owner and days overdue

How it works

The business process, step by step

  1. 01

    Project set-up

    The PMO registers each infrastructure package with its project code, location, project manager, project director, start and due dates, and priority. The project code is the unique identifier, because several packages can share a name.

  2. 02

    Weighted milestones

    Every package carries its physical milestones, such as backfilling, grading, curbstone, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking, each with a weightage and a responsible engineer.

  3. 03

    Site progress

    Site managers log progress against a milestone with a note, site photos and the next action. Each entry keeps the previous and the new percentage, so history is never overwritten.

  4. 04

    Authority approvals

    Statutory approvals are tracked per authority: NWC, SEC and CST / Telecom, stage by stage from design and contractor approval to agreement and handover, with submission ageing and overdue escalation.

  5. 05

    Amanah submissions

    Reports to Amanah and municipality departments move through four stages: submitted, audit review, revised submission and final approval. Overdue responses and reports needing revision are flagged.

  6. 06

    Portfolio view

    The executive dashboard and Project 360 pull it together: actual against planned completion, project health with the reasons behind it, projects requiring attention, and twelve standard reports exported to PDF or Excel.

The solution

What we built for Dahlawi Construction Co.

Shyphan built a custom Infrastructure Project and Approval Management platform for DCC, in English and Arabic, with role-based views for the PMO, project directors, site managers and executive management.

  • Portfolio progress by project, actual against the planned baseline
  • Project health and status distribution
  • Open approvals, overdue approvals, Amanah reports and open issues
  • Projects requiring attention, with condition, owner, days overdue and severity
Executive Dashboard
Executive Dashboard interface
Executive Dashboard screen from the live system (names and values masked)
  • One page per package: actual, planned and variance
  • Health status with the calculated reasons behind it
  • Tabs for milestones, approvals, municipality, updates, documents, issues and activity
Project 360
Project 360 interface
Project 360 screen from the live system (names and values masked)
  • Every physical milestone with weightage, progress, responsible engineer and schedule
  • Portfolio delivery heatmap: every project against every trade
  • Trades from backfilling and grading to asphalt, road signs and marking
Milestones
Milestones interface
Milestones screen from the live system (names and values masked)
  • NWC, SEC and CST / Telecom approvals tracked stage by stage
  • Design, contractor or consultant, agreement and handover stages
  • Submission ageing and overdue escalation
Authority Approvals
Authority Approvals interface
Authority Approvals screen from the live system (names and values masked)
  • Submissions across Amanah and municipality service departments
  • Four stages: submitted, audit review, revised submission, final approval
  • Overdue responses and reports requiring revision flagged
Municipality / Amanah
Municipality / Amanah interface
Municipality / Amanah screen from the live system (names and values masked)
  • Site updates logged against a milestone, with photos and next action
  • Historical values never overwritten: each entry keeps the previous and new percentage
Progress Updates
Progress Updates interface
Progress Updates screen from the live system (names and values masked)
  • Portfolio issue register with severity, owner and target date
  • Open issues by severity, status and category
Issues & Risks
Issues & Risks interface
Issues & Risks screen from the live system (names and values masked)
  • Twelve standard PMO reports, from project progress to approval ageing
  • Director and project manager performance views
  • Export to PDF and Excel
Reports & Analytics
Reports & Analytics interface
Reports & Analytics screen from the live system (names and values masked)
  • Full Arabic interface with right-to-left layout
  • Switch between English and Arabic from any screen
Arabic interface
Arabic interface interface
Arabic interface screen from the live system (names and values masked)

Who uses it

PMO administrator

Sets up projects, milestones and weightage, maintains masters and manages users and permissions

Project directors

Follow their portfolio's completion, variance and open risk, and act on overdue approvals

Site and project managers

Log milestone progress with photos, upload documents and raise issues for their packages

Executive management

Read the portfolio dashboard and reports, with view access across all projects

Architecture

How the systems connect

InputsSite progress updatesSite photosAuthority submissionsAmanah reports
Delivered by Shyphan
OutputsExecutive dashboardProject 360PDF and Excel reports

Integrations

  • Milestones to portfolio progress

    Weighted milestone progress rolls up into project and portfolio completion.

  • Approvals and issues to project health

    Overdue approvals, schedule variance and critical issues set each project health status.

  • Reports to PDF and Excel

    Every report reads live project, milestone and approval records and exports to PDF or Excel.

Reports and dashboards

Executive dashboard

Portfolio progress by project, health distribution and every condition that puts a project at risk

Portfolio delivery heatmap

Every project against every infrastructure trade, with completion per cell

Authority approval ageing

Days pending for every open NWC, SEC and CST submission, bucketed by age

Municipality submission report

Amanah submissions by department, stage, report count and response ageing

The results

What the system does now

  • One live portfolio viewManagement sees actual against planned completion for every package, with health and status at a glance.
  • Approvals that do not slipEach authority approval carries its stage, ageing and owner, and overdue stages surface on the dashboard.
  • Amanah submissions under controlSubmissions move through four stages per department, with overdue responses and revisions flagged.
  • Clear accountabilityProjects requiring attention list the condition, the responsible person and the days overdue.
Delivery

Five phases, discovery to support

  1. 01
    Discovery

    Process mapping, documents and data reviewed with each team.

  2. 02
    Design

    Target flow agreed across 2 apps and 3 integration points.

  3. 03
    Build

    Apps configured, custom logic built and integrations connected.

  4. 04
    Test and train

    User acceptance testing with real scenarios and role-based training.

  5. 05
    Go-live and support

    Cut-over, hypercare and ongoing improvements.

Local rules built in

NWC approvals

National Water Company design, contractor, agreement and handover stages.

SEC approvals

Saudi Electricity design and contractor approval stages with ageing.

CST / Telecom

Communications, Space and Technology Commission approval stages.

Amanah departments

Municipality submissions by service department, in four stages.

Arabic and English

Full RTL Arabic interface alongside English.

FAQ

Questions about this project

What does the DCC platform track?

Every infrastructure package with its weighted physical milestones, site progress updates and photos, statutory approvals from NWC, SEC and CST / Telecom, Amanah and municipality submissions, documents, and issues and risks, all rolled up into an executive dashboard.

How are authority approvals handled?

Each approval is tracked per authority and stage, for example design approval, contractor or consultant approval, agreement and handover. The system records submission dates, ageing and the responsible person, and overdue stages are escalated on the dashboard.

Who uses the system?

Four roles: PMO administrator, project director, project manager and management, each with permissions set in a role permission matrix.

Is the platform available in Arabic?

Yes. The whole interface switches between English and Arabic, with a full right-to-left layout.

Ready to write your own success story?

Send us your brief and a senior consultant will reply within 1 hour with scope, timeline and a fixed quote. No spam, no junior reps.

Talk to us

Where this service is weak - and what we do about it

We are not the cheapest, and we decline work where the budget will not cover doing it properly or where the product is the wrong answer.

How we handle it: You get a written recommendation after the free discovery call either way, including when that recommendation is not to proceed.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn