One PMO command centre for a Saudi infrastructure contractor: portfolio progress, physical milestones, NWC, SEC and CST approvals and every Amanah submission.

Dahlawi Construction Co. (DCC) is a Saudi construction company working since 1976. It delivers turn-key infrastructure projects for public and private sector clients, from project inception to completion.
Each infrastructure package moves through a dozen physical trades and depends on statutory approvals from several authorities and municipality departments. The PMO, project directors and management needed one live view of where every package, approval and submission stands.

Site progress reported separately by each team
Weighted milestone progress rolls up into one portfolio view
Authority approval stages easy to lose track of
NWC, SEC and CST stages tracked with ageing and overdue alerts
Amanah submissions chased by email and phone
Four-stage submission workflow per municipality department
Risk visible only in meetings
Projects requiring attention listed with condition, owner and days overdue
The PMO registers each infrastructure package with its project code, location, project manager, project director, start and due dates, and priority. The project code is the unique identifier, because several packages can share a name.
Every package carries its physical milestones, such as backfilling, grading, curbstone, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking, each with a weightage and a responsible engineer.
Site managers log progress against a milestone with a note, site photos and the next action. Each entry keeps the previous and the new percentage, so history is never overwritten.
Statutory approvals are tracked per authority: NWC, SEC and CST / Telecom, stage by stage from design and contractor approval to agreement and handover, with submission ageing and overdue escalation.
Reports to Amanah and municipality departments move through four stages: submitted, audit review, revised submission and final approval. Overdue responses and reports needing revision are flagged.
The executive dashboard and Project 360 pull it together: actual against planned completion, project health with the reasons behind it, projects requiring attention, and twelve standard reports exported to PDF or Excel.
Shyphan built a custom Infrastructure Project and Approval Management platform for DCC, in English and Arabic, with role-based views for the PMO, project directors, site managers and executive management.









Sets up projects, milestones and weightage, maintains masters and manages users and permissions
Follow their portfolio's completion, variance and open risk, and act on overdue approvals
Log milestone progress with photos, upload documents and raise issues for their packages
Read the portfolio dashboard and reports, with view access across all projects
Weighted milestone progress rolls up into project and portfolio completion.
Overdue approvals, schedule variance and critical issues set each project health status.
Every report reads live project, milestone and approval records and exports to PDF or Excel.
Portfolio progress by project, health distribution and every condition that puts a project at risk
Every project against every infrastructure trade, with completion per cell
Days pending for every open NWC, SEC and CST submission, bucketed by age
Amanah submissions by department, stage, report count and response ageing
Process mapping, documents and data reviewed with each team.
Target flow agreed across 2 apps and 3 integration points.
Apps configured, custom logic built and integrations connected.
User acceptance testing with real scenarios and role-based training.
Cut-over, hypercare and ongoing improvements.
National Water Company design, contractor, agreement and handover stages.
Saudi Electricity design and contractor approval stages with ageing.
Communications, Space and Technology Commission approval stages.
Municipality submissions by service department, in four stages.
Full RTL Arabic interface alongside English.
Every infrastructure package with its weighted physical milestones, site progress updates and photos, statutory approvals from NWC, SEC and CST / Telecom, Amanah and municipality submissions, documents, and issues and risks, all rolled up into an executive dashboard.
Each approval is tracked per authority and stage, for example design approval, contractor or consultant approval, agreement and handover. The system records submission dates, ageing and the responsible person, and overdue stages are escalated on the dashboard.
Four roles: PMO administrator, project director, project manager and management, each with permissions set in a role permission matrix.
Yes. The whole interface switches between English and Arabic, with a full right-to-left layout.
Send us your brief and a senior consultant will reply within 1 hour with scope, timeline and a fixed quote. No spam, no junior reps.
We are not the cheapest, and we decline work where the budget will not cover doing it properly or where the product is the wrong answer.
How we handle it: You get a written recommendation after the free discovery call either way, including when that recommendation is not to proceed.