WhatsApp

Request A Quote

Follow Us On:

Home / Industries / Infrastructure PMO

Road and Municipal Infrastructure Works · Infrastructure PMO

Project Tracking Software for Road and Municipal Infrastructure Works

Roads, sidewalks, lighting, landscape and drainage are reviewed by several Amanah departments, each with its own reports and revision cycles. This platform tracks every submission through submission, audit review, revised submission and final approval, measures road and streetscape trades as weighted milestones, and shows which department is holding the most work.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages
العربية

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Municipality and Amanah submissions for road and municipal infrastructure works
The challenge

What road and municipal infrastructure works businesses struggle with

Several departments per packageRoads, lighting, parks, floods and studies departments each need their own reports, and one late reply can hold up handover.
Revision cycles drag onReports return from audit review with comments, and resubmissions are not tracked against a clear stage.
Finishing trades bunch at the endAsphalt, road signs and road marking all fall at the end of the programme, so slippage earlier hits them hardest.
Weather interrupts earthworksRain events suspend earthworks in low-lying zones and push later road trades back.
Workflow

The road and municipal infrastructure works workflow in the Infrastructure PMO

  1. Prepare the reportThe liaison engineer prepares a technical study, design report, inspection request or handover package for a department.
  2. Submit and countThe submission is registered with its report count, date and report number, and days pending start counting.
  3. Audit reviewThe department reviews the report, and the record moves to audit review or revision required.
  4. Revise and resubmitComments are closed, the revised submission is logged and the stage advances.
  5. Final approvalFinal approval completes the four stages, and Project 360 shows every department's position for the package.
Modules and features

Modules road and municipal infrastructure works teams use

4 modules in the live demo. The main ones are below with what each covers.

Project 360

  • Project header with code, status, priority, location, client or owner, area and contract value field
  • Actual, planned and variance ring with a health rating and the reasons behind it
  • Planned against actual S-curve, milestones in flight and next milestones
  • Authority approval pipeline per authority and Municipality department stage view
  • Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
See the screen

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Municipality and Amanah Submissions

  • Submission tracker across sixteen Amanah departments, named in English and Arabic
  • Four-stage workflow: submitted, audit review, revised submission and final approval
  • Submission types such as technical study, design report, inspection request and handover package
  • Report count, submission date, days pending and report number per submission
  • Charts by workflow stage, by status and by department
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen
Product screenshots

Road and Municipal Infrastructure Works screens

Real screens from the live demo that matter most for this industry.

3 screens · pick one
dcc-demo.shyphan.com
Portfolio delivery heatmap screen in the Infrastructure PMO
Portfolio delivery heatmapEvery project against all thirteen infrastructure trades, with overall weighted completion per package.1 / 3
dcc-demo.shyphan.com
Municipality and Amanah submissions screen in the Infrastructure PMO
Municipality and Amanah submissionsSubmissions by workflow stage, status and Amanah department, with overdue responses counted.2 / 3
dcc-demo.shyphan.com
Issues and risks screen in the Infrastructure PMO
Issues and risksOpen issues by severity, status and category, with overdue against target date.3 / 3
Automation

Automation in the Infrastructure PMO for road and municipal infrastructure works

Rules and alerts in the live demo that do the routine checking for your team.

Rule-based project healthEach project is rated On Track, Attention Required, Delayed or Critical from its variance, overdue approvals and critical issues, and the reasons are listed on Project 360. These are built-in rules, not AI.
Overdue and ageing detectionApproval stages and Amanah submissions are flagged as overdue once they pass their expected date, with days pending and days late calculated and grouped into ageing buckets automatically.
Attention listThe platform collects every open condition that puts a project at risk, such as a late milestone, an overdue approval or a due date 60 days away, and ranks them by severity. This is rule-based automation, not AI.
Use cases

Where it helps road and municipal infrastructure works teams

Floods and rainfall report overdueA report to the floods and rainfall agency passes its expected response. It appears on the package's Needs Attention list with the responsible engineer and days overdue.
Roads maintenance handoverThe handover package for the roads maintenance department reaches final approval, and the department shows as approved on Project 360.
Finishing trades reviewThe PMO filters the milestone register for asphalt and road marking across the portfolio to plan the finishing crews.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO for road and municipal infrastructure works: questions

Which Amanah departments are covered?
The demo lists sixteen departments in English and Arabic, including studies and design, road studies, roads maintenance, lighting maintenance, parks, cleaning, floods and rainfall, naming and numbering, implementation and special plans.
What are the four submission stages?
Submitted, audit review, revised submission and final approval. Each submission also carries a status such as under review, revision required, resubmitted or approved.
Can we search in Arabic?
Yes. The municipality screen can be searched by project or department in English or Arabic, and department names are maintained in both languages.
Which road trades are tracked?
Curbstone, sidewalks and interlock, asphalt, road signs, road marking, street lights and landscape are standard milestones, alongside earthworks and utility networks.
Is this software for the municipality itself?
No. It is built for the developer, contractor or PMO side that submits to the Amanah and tracks the responses. It does not replace the municipality's own systems.
Two people working on laptops at a desk
Get started

See it on your road and municipal infrastructure works process

A guided demo on your own workflow, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn