Infrastructure work in Iraq involves federal ministries, governorate directorates, the Mayoralty of Baghdad and, in the Kurdistan Region, the Kurdistan Regional Government's own ministries. The Shyphan Infrastructure PMO keeps weighted milestones, authority approvals, municipal submissions, site progress and risks for each package in one record, in Arabic and English.

Prefer to talk? Call +91 95651 53545
12modules
4user roles
EN | ARlanguages

Book a demo

Tell us about your business. A Shyphan consultant will walk you through the Infrastructure PMO on your own process.

Your details stay private and are never shared.

dcc-demo.shyphan.com
Executive dashboard in Iraq
Authorities

Approvals and submissions tracked in Iraq

Authorities, approval stages and municipality departments are master data, set up for your market during implementation.

Mayoralty of Baghdad (Amanat Baghdad)Roads and municipality. Submissions to the Mayoralty are set up as departments, each moving through submission, audit review, revised submission and final approval.
Baghdad Water Authority (BWA) and Baghdad Sewerage Directorate (BSD)Water and sewerage. For packages inside Baghdad, water and sewerage approvals are tracked as separate authority lines with stage, reference and days pending.
Ministry of Construction, Housing, Municipalities and Public Works (MCHMPW) and governorate General Directorates of Water and SewerageWater and sewerage. Outside Baghdad and the Kurdistan Region, submissions to the governorate directorate are logged per stage.
Ministry of Electricity (MoE)Electricity. Steps with the ministry's local directorate are held as stages, so overdue items escalate on the dashboard.
Ministry of Communications and the Iraqi Telecommunications and Post Company (ITPC)Telecom. Telecom approvals and coordination on the fixed network are logged per stage, with the responsible engineer and expected date.
National Investment Commission (NIC), provincial investment commissions and the Kurdistan Region Board of Investment (BOI)Permits. Where a project runs under an investment licence, the licence and follow-up submissions sit in the document and approval registers.
KRG Ministry of Municipalities and TourismWater and sewerage. In the Kurdistan Region, water, sewerage and municipal submissions to this ministry get their own authority and departments.
KRG Ministry of ElectricityElectricity. Electricity approvals for packages in the Kurdistan Region are tracked against the regional ministry rather than the federal one.
The challenge

What infrastructure teams in Iraq struggle with

Federal and regional set-ups side by sideA contractor working in Baghdad and Erbil deals with different ministries for the same scope, so one portfolio needs two sets of authorities without mixing them up.
Water and sewerage split across bodiesIn Baghdad, water and sewerage sit with BWA and BSD, while in other governorates they sit with governorate directorates, so each package needs the right approval lines.
Approvals that age without anyone noticingWhen submissions are tracked in letters and spreadsheets, a design approval can sit for weeks before a director hears about it.
Progress and evidence in different placesSite photos, drawings and approval letters scattered across email make steering meetings slow to prepare.
Set-up

How the Infrastructure PMO works in Iraq

  1. Configure federal and KRG mastersShyphan loads the authorities per location: for example the Mayoralty of Baghdad, BWA, BSD and the Ministry of Electricity in Baghdad, and the KRG ministries in the Kurdistan Region.
  2. Set up each packageThe PMO creates the project with its code, governorate, owner, manager and director, and loads the physical milestones with their weightage.
  3. Register submissions with referencesEach stage is logged with its submission date, expected date, reference and engineer, so ageing counts from day one.
  4. Report progress from siteSite managers update milestone percentages with a constraint, next action and photo; completion recalculates from the weights.
  5. Log issues, risks and documentsUtilities clashes go into the risk register; drawings, licences and approval letters go into the document register.
  6. Review exceptions and reportDirectors act on overdue approvals and late milestones from the dashboard and Project 360, and the PMO exports standard reports to PDF or Excel.
Modules and features

Infrastructure PMO modules

12 modules in the live demo. The main ones are below with what each covers.

Executive Dashboard

  • Portfolio totals for projects, average completion against plan, critical projects, open approvals, Amanah reports and open issues
  • Portfolio progress bar chart of actual against planned baseline, with a click through to Project 360
  • Project health and project status distribution
  • Projects Requiring Attention list covering overdue approvals, schedule variance, late milestones, critical issues and approaching due dates
  • Filter by project director
See the screen

Project Portfolio

  • Card and table views of every infrastructure package under PMO monitoring
  • Overall completion, planned percentage and variance per package
  • Current milestone, project manager, project director and due date
  • Open approvals, open issues and document counts on each card
  • Filters for manager, director, status, health, location, due date and progress band
See the screen

Project 360

  • Project header with code, status, priority, location, client or owner, area and contract value field
  • Actual, planned and variance ring with a health rating and the reasons behind it
  • Planned against actual S-curve, milestones in flight and next milestones
  • Authority approval pipeline per authority and Municipality department stage view
  • Tabs for milestones, approvals, municipality, progress updates, documents, issues and a full activity history
See the screen

Milestones and Weightage

  • Thirteen physical trades per package: backfilling, grading, curbstone, sidewalks and interlock, storm network, sewage and water, MV electricity, telecom, street lights, landscape, asphalt, road signs and road marking
  • Weightage per milestone that rolls up to overall completion
  • Portfolio delivery heatmap of every project against every trade
  • Completion by milestone type and average progress per trade
  • Milestone register with status, planned end, responsible engineer and overdue filter
See the screen

Authority Approvals

  • Statutory approval tracker for NWC, SEC and CST / Telecom
  • Stages such as agreement, design approval, contractor or consultant approval and handover
  • Statuses from not started and preparing through submitted, under review, revision required and resubmitted to approved
  • Submission date, expected date, days pending, days late, reference number and responsible engineer
  • Status by authority chart and an ageing profile in 0 to 15, 16 to 30, 31 to 60, 61 to 90 and 90+ day buckets, sorted most overdue first
See the screen

Municipality and Amanah Submissions

  • Submission tracker across sixteen Amanah departments, named in English and Arabic
  • Four-stage workflow: submitted, audit review, revised submission and final approval
  • Submission types such as technical study, design report, inspection request and handover package
  • Report count, submission date, days pending and report number per submission
  • Charts by workflow stage, by status and by department
See the screen

Progress Updates

  • Site progress log against each milestone, in timeline or table view
  • Previous and new percentage kept on every entry, never overwritten
  • Work description, highlighted constraint and next action
  • Site photograph or note attached to the update
  • Filters by project and contributor
See the screen

Documents

  • Central register for drawings, design submissions, authority submissions and approval letters
  • Municipality reports, site photographs, meeting minutes, handover and technical reports
  • Document number, version, file type, size, date and uploader
  • DWG, PDF, JPG, DOCX and XLSX files with preview and download
  • Card and table views with project, category and file type filters
See the screen

Issues and Risks

  • Portfolio issue and risk register with owner, raised date and target date
  • Categories including design, authority approval, municipality, material and supply, manpower, contractor, site condition, weather, utilities clash and commercial
  • Severity from low to critical and status from open to closed
  • Overdue against target count
  • Charts by severity, status and category
See the screen

Reports and Analytics

  • Standard PMO pack of twelve reports read live from the same records
  • Project progress, milestone progress, project delay, project health and due date reports
  • Project director performance and project manager portfolio reports
  • Authority approval ageing, overdue approval and municipality submission reports
  • Document register and issue and risk reports, filtered by director or project, with PDF and Excel export
See the screen

Masters

  • Projects master with code, English and Arabic name, site manager, director, dates, status, priority and milestone count
  • Milestones, authorities and approval stages
  • Municipality departments and managers and directors
  • Status values, document categories and issue categories
See the screen

Administration and Permissions

  • Users with title, role and bilingual display name
  • Four roles: PMO Administrator, Project Director, Project Manager and Management
  • Role permission matrix across fourteen capabilities, from viewing projects to system administration
  • Localisation settings for English (LTR) and Arabic (RTL)
  • Demo data reset to a seeded baseline
See the screen
Product screenshots

Infrastructure PMO screens

Real screens from the live demo, shown with its Saudi set-up.

16 screens · pick one
dcc-demo.shyphan.com
Executive dashboard screen in the Infrastructure PMO
Executive dashboardPortfolio completion against plan, critical projects, open approvals, Amanah reports and project health on one screen.1 / 16
dcc-demo.shyphan.com
Project portfolio screen in the Infrastructure PMO
Project portfolioEvery package with completion, variance, current milestone, manager, director and open approvals.2 / 16
dcc-demo.shyphan.com
Project 360 screen in the Infrastructure PMO
Project 360Actual against planned progress, the health rating with its reasons and the key facts for one package.3 / 16
dcc-demo.shyphan.com
Project 360 approvals tab screen in the Infrastructure PMO
Project 360 approvals tabStage-by-stage position with NWC, SEC and CST for one package, with dates, reference numbers and days pending.4 / 16
dcc-demo.shyphan.com
Project activity history screen in the Infrastructure PMO
Project activity historyA full audit trail of milestone updates, Amanah submissions and uploads for the package.5 / 16
dcc-demo.shyphan.com
Portfolio delivery heatmap screen in the Infrastructure PMO
Portfolio delivery heatmapEvery project against all thirteen infrastructure trades, with overall weighted completion per package.6 / 16
dcc-demo.shyphan.com
Authority approvals tracker screen in the Infrastructure PMO
Authority approvals trackerApproval stages by authority with approved, review, revision and overdue counts and average ageing.7 / 16
dcc-demo.shyphan.com
Municipality and Amanah submissions screen in the Infrastructure PMO
Municipality and Amanah submissionsSubmissions by workflow stage, status and Amanah department, with overdue responses counted.8 / 16
dcc-demo.shyphan.com
Progress update log screen in the Infrastructure PMO
Progress update logSite updates with previous and new percentage, constraint, next action and attached site photo.9 / 16
dcc-demo.shyphan.com
Document register screen in the Infrastructure PMO
Document registerDrawings, design submissions, authority packages and minutes with document number and version.10 / 16
dcc-demo.shyphan.com
Issues and risks screen in the Infrastructure PMO
Issues and risksOpen issues by severity, status and category, with overdue against target date.11 / 16
dcc-demo.shyphan.com
Reports and analytics screen in the Infrastructure PMO
Reports and analyticsThe standard PMO reporting pack with PDF and Excel export, filtered by director or project.12 / 16
dcc-demo.shyphan.com
Masters screen in the Infrastructure PMO
MastersConfiguration data for projects, milestones, authorities, approval stages and Amanah departments.13 / 16
dcc-demo.shyphan.com
Role permission matrix screen in the Infrastructure PMO
Role permission matrixFour roles and what each can view, update and manage across the platform.14 / 16
dcc-demo.shyphan.com
Arabic executive dashboard screen in the Infrastructure PMO
Arabic executive dashboardThe same dashboard in Arabic with a full right-to-left layout.15 / 16
dcc-demo.shyphan.com
Arabic approvals tracker screen in the Infrastructure PMO
Arabic approvals trackerThe authority approvals screen in Arabic, with authority names shown in both languages.16 / 16
Use cases

Where it helps in Iraq

Contractors with work in Baghdad and the Kurdistan RegionRun one portfolio with federal and KRG authorities set per location.
Developers of licensed investment projectsKeep the investment licence, utility approvals and milestones for each phase together.
PMO teams on municipal infrastructure packagesTrack Mayoralty or governorate submissions by department alongside water, electricity and telecom approvals for every package.
Integrations, localisation and support

Set up for your country, connected to your systems

What the product handles out of the box, and what Shyphan does to put it live in your business.

Built into the product

Languages
EnglishArabicRight-to-left Arabic
Currencies
SAR
Integrations
PDF and Excel export

Delivered and supported in

Saudi ArabiaUAEIndiaBahrainQatarKuwaitOmanIraqEgyptJordan

Plus the UK, Europe, the USA and other markets, from Shyphan offices in India, the UAE, Saudi Arabia and four more countries.

How Shyphan puts it live

Discovery and fitA walk through your process against the product, then a written scope and fixed quote.
ConfigurationYour company, branches, users, roles, numbering, taxes and print layouts set up.
Data migrationMasters, open balances and history moved from spreadsheets or your old system and checked.
CustomisationExtra fields, screens, approvals, reports and integrations built to your process.
TrainingRole-based sessions for every team, in English or Arabic, plus short guides.
24/7 supportSupport from Shyphan's offices around the clock after go-live, with a named consultant.
Live demo

Try the Infrastructure PMO yourself

No sign-up. The demo opens in your browser with sample data.

  1. Open the live demo in a new tab.
  2. Open the demo and pick a demo role (PMO Admin, Director, Site Manager or Management) on the sign-in screen. The password is pre-filled, so just click Sign in.
  3. Explore the screens freely. It is a demo company with sample data.
  4. Book a guided demo and we will set it up around your own process.
dcc-demo.shyphan.com
Sign-in screen of the Infrastructure PMO live demo
FAQ

Infrastructure PMO in Iraq: questions

Which authorities does it track in Iraq?
Authorities are master data, so Shyphan configures the bodies your packages use: typically the Mayoralty of Baghdad, BWA, BSD, governorate water and sewerage directorates, the Ministry of Electricity, ITPC and investment commissions, plus the KRG ministries and Board of Investment for the Kurdistan Region.
Is the system available in Arabic? What about Kurdish?
The whole interface switches between English and Arabic, with a full right-to-left Arabic layout. Kurdish is not an interface language in the current product, but authority and department names can be entered as they appear on your documents.
Does it connect to authority portals or ministry systems?
No. It does not connect to any authority portal. The PMO records each submission, the reference number, the dates and the response, so the tracker shows where every approval stands. Integration with a specific portal can be scoped separately if you need it.
How does set-up work for an Iraqi portfolio?
Shyphan runs a short discovery session, then configures authorities, approval stages, municipal departments, milestones and weightage for each location. Existing trackers can be loaded and checked with your PMO before go-live, and 24/7 support follows after launch.
Can it handle budgets or payment certificates?
No. It tracks delivery and approvals only; there are no BOQs, budgets, invoices or payment certificates. An ERP link can be a separate piece of work.
Two people working on laptops at a desk
Get started

See it on your Iraq portfolio

A guided demo with your authorities and milestones, then a written scope and a fixed quote.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 27 November 2026. Meet the team · LinkedIn