Bill of Materials Software in the UAE
Bill of materials software in the UAE holds the recipe for every product you make: components, quantities, sub-assemblies, routings and costs, kept under version control. We implement it for UAE manufacturers and assemblers, usually on Odoo Manufacturing or Business Central, so engineering changes flow straight into purchasing, stock and product costing without a spreadsheet in between.
Prefer to talk? Call +971 55 145 3265Book a free Odoo consultation
Tell us what you want to fix. A senior consultant replies within one working day with a written view.
Trusted by businesses across the UAE, Saudi Arabia and beyond
Bill of Materials Software in the UAE: the short answer
- What it is
- Bill of materials software defines what goes into each product, in what quantity and how it is built, then drives purchasing, stock and costing from that single definition.
- Best suited to
- UAE manufacturers, assemblers, food producers, furniture makers and metal fabricators whose products have several levels of components, many variants or frequent engineering changes.
- Core stack
- Odoo Manufacturing, Odoo PLM, Odoo Inventory, Business Central, Zoho Inventory, Power BI
- Typical timeline
- Three to six weeks for a focused single-app rollout; eight to sixteen weeks for a multi-app deployment with data migration and integrations.
- What it costs
- Odoo bills its licence separately, per user. Implementation is quoted as a fixed price in AED after a free 30-minute discovery call, based on apps, data and integrations.
- Local specifics
- Free zone and mainland plants; Imported components and landed cost; Arabic and English documents.
- Delivered by
- Shyphan AI Solutions, Official Odoo Partner and Zoho Premium Partner, from its Ras Al Khaimah office with remote delivery across all seven emirates.
- Last reviewed
- 29 September 2026

Bill of Materials Software in the UAE: who it is for
UAE manufacturers, assemblers, food producers, furniture makers and metal fabricators whose products have several levels of components, many variants or frequent engineering changes. Bill of materials software defines what goes into each product, in what quantity and how it is built, then drives purchasing, stock and costing from that single definition.
- Multi-level BOMs and sub-assemblies
- Engineering change control
- Variants without duplicate BOMs
- Rolled-up product costing
What we use to deliver bill of materials software
Only what the first phase needs is switched on; more follows in later phases.
Bill of Materials Software in the UAE: what is included
Bill of materials software in the UAE holds the recipe for every product you make: components, quantities, sub-assemblies, routings and costs, kept under version control.
Multi-level BOMs and sub-assemblies
Finished goods, sub-assemblies and raw materials are nested in levels, so a change to one component updates every product that uses it. Kit BOMs explode into their parts at picking without creating a separate stock item for the kit itself.
Engineering change control
With Odoo PLM, engineering change orders route BOM revisions through approval, keep the previous version on record and set an effective date, so production never builds from a superseded drawing and you can always see who changed what and why.
Variants without duplicate BOMs
One BOM can serve every colour, size or voltage variant, with lines that apply only to specific attribute values. That avoids maintaining hundreds of near-identical BOMs as your catalogue grows and keeps changes in one place.
Rolled-up product costing
Component costs, labour on each work centre and overheads roll up into a cost per unit, so quotations and margin reports use the real cost of the current BOM version rather than an estimate someone made last year.
BOM-driven purchasing
Sales orders and forecasts explode through the BOM into component requirements, and replenishment rules raise purchase or manufacturing orders for the shortfall, taking stock on hand and supplier lead times into account.
Scrap, yield and by-products
Expected scrap and by-products are defined per BOM line, which matters in food, plastics and metal cutting where output rarely equals input. Actual consumption is compared with the BOM after each order so the recipe can be corrected.
HVAC equipment maker managing substitute parts
How bill of materials software in the UAE looks in practice. Illustrative; every project is scoped to the business.

For example, a manufacturer of air handling units in an Abu Dhabi industrial zone builds units from imported fans, motors and coils. When an approved motor brand is delayed at the port, supervisors swap in an alternative, but nobody updates the BOM. Finished units then carry wrong cost, and the warranty team cannot tell which motor was fitted in which unit.
- Define approved alternative components on each BOM line with priority order, so a substitute can be used only if it is on the engineering-approved list.
- Record the actual component lots and serials consumed on each manufacturing order, linking every finished unit's serial number to the parts fitted.
- Recalculate the unit's actual cost from the parts really used, and report substitution frequency so purchasing can see which imports cause most swaps.
See it in Odoo Manufacturing
Real screens from the platforms we implement. Yours are configured to your entities, processes and KPIs.

The shop floor view in Odoo Manufacturing
Manufacturing orders as cards for operators, showing each step such as roasting, grinding and packaging, the work station to use and production quantities to register.
- Multi-level BOMs and sub-assemblies
- Engineering change control
- Variants without duplicate BOMs

The master production schedule in Odoo
Forecasted demand, indirect demand, suggested replenishment and forecasted stock per product, month by month, for planning what to make or buy.
- Rolled-up product costing
- Free zone and mainland plants
- Imported components and landed cost
Which platform for bill of materials software in the UAE?
An honest comparison. We implement all of these, so the recommendation follows your processes, team and budget.
| Option | Best when | How it fits this need |
|---|---|---|
| Odoo Manufacturing + PLM | You need engineering change control and traceability without enterprise pricing. | Multi-level BOMs, change orders, lots and serials are standard. A good fit for UAE manufacturers with engineering teams of a few people and moderate volumes. |
| Dynamics 365 Business Central | Manufacturing is one part of a Microsoft-based group. | Production BOMs, routings and item tracking are mature. Engineering change control is lighter than Odoo PLM unless extended through AL or an add-on. |
| Zoho Inventory | You assemble simple kits with one BOM level. | Composite items handle straightforward assembly. Multi-level BOMs, routings and approved alternates need a manufacturing ERP instead. Zoho Inventory remains a sensible start for simple assembly businesses. |
| Dynamics 365 Supply Chain Management | High-volume, multi-site manufacturing with advanced planning needs. | Strong for complex planning across plants. For most single-plant UAE manufacturers it adds cost and project length without matching benefit. Consider it once multiple plants plan together. |
What changes in the UAE
The local rules and realities we design for before go-live. Rules change, so we re-check the current position at scoping.
Free zone and mainland plants
Many UAE manufacturers run a plant in a free zone such as KIZAD, RAKEZ or Hamriyah and sell on the mainland. BOM costing is set per company so internal transfer prices and VAT treatment stay clear.
Imported components and landed cost
Most components are imported and attract the 5% GCC customs duty plus freight and clearing. Landed costs are added to component costs so the BOM roll-up reflects what parts really cost at your door.
Arabic and English documents
Product names, work instructions and pick lists can print in Arabic and English, which helps mixed shop-floor teams and customers who ask for bilingual labels and documents.
What drives the cost, and what it connects to
No price list: we quote a fixed price in AED after discovery. These are the factors that move the effort up or down.
BOM levels and count
A few hundred single-level BOMs load quickly; thousands of multi-level BOMs with routings need cleansing, validation and testing that take much longer.
Traceability requirements
Serial and lot tracking through production adds scanning, labelling and process discipline. Businesses without warranty or recall exposure can keep it lighter.
Alternates and change control
Approved substitutes and formal engineering change orders add configuration and approval flows beyond a basic BOM, especially with several engineers approving each change.
Imported component costing
Allocating freight, duty and clearing to imported parts needs landed cost rules, which directly affect every rolled-up product cost. Simple local purchasing without imports keeps this part small.
What it connects to
Engineering BOM structures export from design software and import as manufacturing BOMs, reducing retyping between engineering and production.
Duty and clearing charges from import declarations flow into landed cost for the components received.
Purchase orders for BOM shortages go to suppliers, and confirmed delivery dates update planned production.
Serial labels for finished units print from the manufacturing order, linking the physical unit to its record.
Standard against actual cost, substitution frequency and scrap by product flow into management reporting.
How we deliver bill of materials software
Phases, indicative timing and what is delivered in each. Scope is fixed and priced in AED before we start.
Product audit
We review your product structures, drawings, BOM spreadsheets and costing method, and choose the products that best represent your complexity.
Platform choice
Odoo Manufacturing, Business Central or a lighter Zoho Inventory assembly setup compared against your BOM depth and volumes.
BOM build
BOMs, routings, work centres, variants and costing rules are configured, and existing BOMs are imported and checked line by line.
Trial orders
Real orders run in a test copy so planners compare component demand, costs and shop-floor paperwork with today's figures.
Go-live
Production moves to the new BOMs, change control is switched on and your engineers are trained to own revisions.
When bill of materials software is the wrong answer
If you make simple products with two or three components, full BOM software is more than you need: Zoho Inventory composite items or Odoo kits cover it at lower cost. BOM software is also not a design tool. If engineering lives in CAD or a PDM system, we link to it rather than replace it, and highly configured-to-order products may need a configurator on top.
How we handle it: We implement Zoho, Odoo and Dynamics 365 and build AI and custom software, so our written recommendation can point you to a simpler option, or to doing nothing yet.
Checklist and common mistakes
Buyer's checklist
What to ask for before you choose a provider.
- Ask how approved alternative components are defined and whether supervisors can be blocked from using unapproved substitutes.
- Confirm the system records actual components consumed per order, not just the standard BOM quantities.
- Check serial and lot traceability from finished product back to supplier batches for warranty and recall purposes.
- Require a clear engineering change process with approval, effective date and handling of work already in progress.
- Ask how landed costs of imported components, including the 5% customs duty, flow into BOM cost rollups.
- Confirm existing BOMs in Excel or an old system can be imported with their levels and units intact.
Common mistakes
What we see go wrong in the UAE, and how to avoid it.
- Substitutes used off the recordSwapping components on the shop floor without recording them breaks costing and warranty tracing. Define approved alternates and require them to be recorded on the order.
- Standard costs never refreshedUAE manufacturers often set standard costs once. When import prices or freight change, rolled-up costs drift. Review and update them at agreed intervals.
- One BOM for all variantsCopying a BOM for every size and colour creates hundreds of near-duplicates. Use variant rules so a change applies across related products at once.
- Engineering and production not alignedEngineering keeps its own BOM list while production uses another. Make the ERP BOM the single approved version with changes going through one process.


A UAE team you can meet in person
That is our team at Zoholics Dubai 2026. We deliver Odoo projects from our Ras Al Khaimah office with remote delivery across all seven emirates, in English and Arabic, and we run workshops on site in Dubai, Abu Dhabi and Sharjah when a project needs it.
Bill of Materials Software in the UAE: questions we get asked
What is bill of materials software and do UAE manufacturers need it?
Can you import our existing Excel BOMs?
Odoo or Business Central for bill of materials software in the UAE?
How is BOM software different from manufacturing inventory software?
Can we keep customer-specific versions of a BOM?
How much does bill of materials software cost in the UAE?
Can bill of materials software handle approved substitute components?
How does BOM software support warranty claims for UAE manufacturers?
Do UAE manufacturers need separate BOMs for costing and production?
Why choose Shyphan?

Talk to a consultant about bill of materials software
A free 30-minute call, then a written recommendation and a fixed quote in AED, including the honest option that this is not the right fit.




