WhatsApp

Request A Quote

Follow Us On:

A worker assembling metal parts in a factory
United Arab Emirates flagManufacturing BOMs · UAE

Bill of Materials Software in the UAE

Bill of materials software in the UAE holds the recipe for every product you make: components, quantities, sub-assemblies, routings and costs, kept under version control. We implement it for UAE manufacturers and assemblers, usually on Odoo Manufacturing or Business Central, so engineering changes flow straight into purchasing, stock and product costing without a spreadsheet in between.

Prefer to talk? Call +971 55 145 3265
Typical timeline3-16 weeks
PricingFixed quote in AED
Core stackOdoo Manufacturing · Odoo PLM · Odoo Inventory
Zoho Premium PartnerOdoo

Book a free Odoo consultation

Tell us what you want to fix. A senior consultant replies within one working day with a written view.

Your details stay private under the UAE PDPL. Never shared.

Trusted by businesses across the UAE, Saudi Arabia and beyond

  • Netflix logo
  • PIF logo
  • Bupa CareConnect logo
  • Mazaya Smart Systems logo
  • Laban Key logo
  • Nebras Alkhaleej logo
  • Purity Tech logo
  • Vetic logo
  • RapidRun Courier logo
  • UBL logo
  • Colo logo
  • Cosmos Gourmet logo
At a glance

Bill of Materials Software in the UAE: the short answer

What it is
Bill of materials software defines what goes into each product, in what quantity and how it is built, then drives purchasing, stock and costing from that single definition.
Best suited to
UAE manufacturers, assemblers, food producers, furniture makers and metal fabricators whose products have several levels of components, many variants or frequent engineering changes.
Core stack
Odoo Manufacturing, Odoo PLM, Odoo Inventory, Business Central, Zoho Inventory, Power BI
Typical timeline
Three to six weeks for a focused single-app rollout; eight to sixteen weeks for a multi-app deployment with data migration and integrations.
What it costs
Odoo bills its licence separately, per user. Implementation is quoted as a fixed price in AED after a free 30-minute discovery call, based on apps, data and integrations.
Local specifics
Free zone and mainland plants; Imported components and landed cost; Arabic and English documents.
Delivered by
Shyphan AI Solutions, Official Odoo Partner and Zoho Premium Partner, from its Ras Al Khaimah office with remote delivery across all seven emirates.
Last reviewed
29 September 2026
A worker assembling metal parts in a factory
A worker assembling metal parts in a factory
3-16 wks typical time to a first go-live
Manufacturing BOMs

Bill of Materials Software in the UAE: who it is for

UAE manufacturers, assemblers, food producers, furniture makers and metal fabricators whose products have several levels of components, many variants or frequent engineering changes. Bill of materials software defines what goes into each product, in what quantity and how it is built, then drives purchasing, stock and costing from that single definition.

  • Multi-level BOMs and sub-assemblies
  • Engineering change control
  • Variants without duplicate BOMs
  • Rolled-up product costing
What people in this role search for
bill of materials software UAEBOM software UAEBOM management system UAEOdoo BOM UAEengineering change management software UAEproduct costing software UAE
The stack

What we use to deliver bill of materials software

Only what the first phase needs is switched on; more follows in later phases.

What we deliver

Bill of Materials Software in the UAE: what is included

Bill of materials software in the UAE holds the recipe for every product you make: components, quantities, sub-assemblies, routings and costs, kept under version control.

01

Multi-level BOMs and sub-assemblies

Finished goods, sub-assemblies and raw materials are nested in levels, so a change to one component updates every product that uses it. Kit BOMs explode into their parts at picking without creating a separate stock item for the kit itself.

02

Engineering change control

With Odoo PLM, engineering change orders route BOM revisions through approval, keep the previous version on record and set an effective date, so production never builds from a superseded drawing and you can always see who changed what and why.

03

Variants without duplicate BOMs

One BOM can serve every colour, size or voltage variant, with lines that apply only to specific attribute values. That avoids maintaining hundreds of near-identical BOMs as your catalogue grows and keeps changes in one place.

04

Rolled-up product costing

Component costs, labour on each work centre and overheads roll up into a cost per unit, so quotations and margin reports use the real cost of the current BOM version rather than an estimate someone made last year.

05

BOM-driven purchasing

Sales orders and forecasts explode through the BOM into component requirements, and replenishment rules raise purchase or manufacturing orders for the shortfall, taking stock on hand and supplier lead times into account.

06

Scrap, yield and by-products

Expected scrap and by-products are defined per BOM line, which matters in food, plastics and metal cutting where output rarely equals input. Actual consumption is compared with the BOM after each order so the recipe can be corrected.

A worked example

HVAC equipment maker managing substitute parts

How bill of materials software in the UAE looks in practice. Illustrative; every project is scoped to the business.

The shop floor view in Odoo Manufacturing
The shop floor view in Odoo Manufacturing. Screenshot: Odoo S.A.

For example, a manufacturer of air handling units in an Abu Dhabi industrial zone builds units from imported fans, motors and coils. When an approved motor brand is delayed at the port, supervisors swap in an alternative, but nobody updates the BOM. Finished units then carry wrong cost, and the warranty team cannot tell which motor was fitted in which unit.

  1. Define approved alternative components on each BOM line with priority order, so a substitute can be used only if it is on the engineering-approved list.
  2. Record the actual component lots and serials consumed on each manufacturing order, linking every finished unit's serial number to the parts fitted.
  3. Recalculate the unit's actual cost from the parts really used, and report substitution frequency so purchasing can see which imports cause most swaps.
What changes: Substitutions happen within engineering rules, finished unit costs reflect what was built, and the warranty team can trace any unit back to its fitted components when a customer raises a claim.
Real product screens

See it in Odoo Manufacturing

Real screens from the platforms we implement. Yours are configured to your entities, processes and KPIs.

odoo.com
The shop floor view in Odoo Manufacturing (product screenshot)
Odoo · real product screen

The shop floor view in Odoo Manufacturing

Manufacturing orders as cards for operators, showing each step such as roasting, grinding and packaging, the work station to use and production quantities to register.

  • Multi-level BOMs and sub-assemblies
  • Engineering change control
  • Variants without duplicate BOMs
Screenshot: Odoo S.A. (source). Shown for illustration; your screens are configured to your data.
odoo.com
The master production schedule in Odoo (product screenshot)
Odoo · real product screen

The master production schedule in Odoo

Forecasted demand, indirect demand, suggested replenishment and forecasted stock per product, month by month, for planning what to make or buy.

  • Rolled-up product costing
  • Free zone and mainland plants
  • Imported components and landed cost
Screenshot: Odoo S.A. (source). Shown for illustration; your screens are configured to your data.
Options compared

Which platform for bill of materials software in the UAE?

An honest comparison. We implement all of these, so the recommendation follows your processes, team and budget.

OptionBest whenHow it fits this need
Odoo Manufacturing + PLMYou need engineering change control and traceability without enterprise pricing.Multi-level BOMs, change orders, lots and serials are standard. A good fit for UAE manufacturers with engineering teams of a few people and moderate volumes.
Dynamics 365 Business CentralManufacturing is one part of a Microsoft-based group.Production BOMs, routings and item tracking are mature. Engineering change control is lighter than Odoo PLM unless extended through AL or an add-on.
Zoho InventoryYou assemble simple kits with one BOM level.Composite items handle straightforward assembly. Multi-level BOMs, routings and approved alternates need a manufacturing ERP instead. Zoho Inventory remains a sensible start for simple assembly businesses.
Dynamics 365 Supply Chain ManagementHigh-volume, multi-site manufacturing with advanced planning needs.Strong for complex planning across plants. For most single-plant UAE manufacturers it adds cost and project length without matching benefit. Consider it once multiple plants plan together.
UAE specifics

What changes in the UAE

The local rules and realities we design for before go-live. Rules change, so we re-check the current position at scoping.

Free zone and mainland plants

Many UAE manufacturers run a plant in a free zone such as KIZAD, RAKEZ or Hamriyah and sell on the mainland. BOM costing is set per company so internal transfer prices and VAT treatment stay clear.

Imported components and landed cost

Most components are imported and attract the 5% GCC customs duty plus freight and clearing. Landed costs are added to component costs so the BOM roll-up reflects what parts really cost at your door.

Arabic and English documents

Product names, work instructions and pick lists can print in Arabic and English, which helps mixed shop-floor teams and customers who ask for bilingual labels and documents.

Cost and integrations

What drives the cost, and what it connects to

No price list: we quote a fixed price in AED after discovery. These are the factors that move the effort up or down.

BOM levels and count

A few hundred single-level BOMs load quickly; thousands of multi-level BOMs with routings need cleansing, validation and testing that take much longer.

Traceability requirements

Serial and lot tracking through production adds scanning, labelling and process discipline. Businesses without warranty or recall exposure can keep it lighter.

Alternates and change control

Approved substitutes and formal engineering change orders add configuration and approval flows beyond a basic BOM, especially with several engineers approving each change.

Imported component costing

Allocating freight, duty and clearing to imported parts needs landed cost rules, which directly affect every rolled-up product cost. Simple local purchasing without imports keeps this part small.

What it connects to

CAD and PLM tools

Engineering BOM structures export from design software and import as manufacturing BOMs, reducing retyping between engineering and production.

Customs clearing agents

Duty and clearing charges from import declarations flow into landed cost for the components received.

Supplier portals and email

Purchase orders for BOM shortages go to suppliers, and confirmed delivery dates update planned production.

Barcode label printers

Serial labels for finished units print from the manufacturing order, linking the physical unit to its record.

Power BI

Standard against actual cost, substitution frequency and scrap by product flow into management reporting.

How it works

How we deliver bill of materials software

Phases, indicative timing and what is delivered in each. Scope is fixed and priced in AED before we start.

1Weeks 1-2

Product audit

We review your product structures, drawings, BOM spreadsheets and costing method, and choose the products that best represent your complexity.

2Weeks 2-3

Platform choice

Odoo Manufacturing, Business Central or a lighter Zoho Inventory assembly setup compared against your BOM depth and volumes.

3Weeks 3-7

BOM build

BOMs, routings, work centres, variants and costing rules are configured, and existing BOMs are imported and checked line by line.

4Weeks 7-9

Trial orders

Real orders run in a test copy so planners compare component demand, costs and shop-floor paperwork with today's figures.

5Week 9 onward

Go-live

Production moves to the new BOMs, change control is switched on and your engineers are trained to own revisions.

When bill of materials software is the wrong answer

If you make simple products with two or three components, full BOM software is more than you need: Zoho Inventory composite items or Odoo kits cover it at lower cost. BOM software is also not a design tool. If engineering lives in CAD or a PDM system, we link to it rather than replace it, and highly configured-to-order products may need a configurator on top.

How we handle it: We implement Zoho, Odoo and Dynamics 365 and build AI and custom software, so our written recommendation can point you to a simpler option, or to doing nothing yet.

Before you buy

Checklist and common mistakes

Buyer's checklist

What to ask for before you choose a provider.

  • Ask how approved alternative components are defined and whether supervisors can be blocked from using unapproved substitutes.
  • Confirm the system records actual components consumed per order, not just the standard BOM quantities.
  • Check serial and lot traceability from finished product back to supplier batches for warranty and recall purposes.
  • Require a clear engineering change process with approval, effective date and handling of work already in progress.
  • Ask how landed costs of imported components, including the 5% customs duty, flow into BOM cost rollups.
  • Confirm existing BOMs in Excel or an old system can be imported with their levels and units intact.

Common mistakes

What we see go wrong in the UAE, and how to avoid it.

  • Substitutes used off the recordSwapping components on the shop floor without recording them breaks costing and warranty tracing. Define approved alternates and require them to be recorded on the order.
  • Standard costs never refreshedUAE manufacturers often set standard costs once. When import prices or freight change, rolled-up costs drift. Review and update them at agreed intervals.
  • One BOM for all variantsCopying a BOM for every size and colour creates hundreds of near-duplicates. Use variant rules so a change applies across related products at once.
  • Engineering and production not alignedEngineering keeps its own BOM list while production uses another. Make the ERP BOM the single approved version with changes going through one process.
The Shyphan team at the Zoho booth, Zoholics Dubai 2026Shyphan consultants at Zoholics Dubai 2026
Who you will work with

A UAE team you can meet in person

That is our team at Zoholics Dubai 2026. We deliver Odoo projects from our Ras Al Khaimah office with remote delivery across all seven emirates, in English and Arabic, and we run workshops on site in Dubai, Abu Dhabi and Sharjah when a project needs it.

PremiumZoho Partner tier
Top PartnerZoho MEA, Q3 2026
7 officesincl. Ras Al Khaimah
EN / ARDelivery languages
FAQ

Bill of Materials Software in the UAE: questions we get asked

What is bill of materials software and do UAE manufacturers need it?
Bill of materials software stores the structure and cost of every product and drives purchasing and production from it. UAE manufacturers need it once products have sub-assemblies, variants or regular design changes, because spreadsheets then drift from what the shop floor actually builds and costs stop being reliable.
Can you import our existing Excel BOMs?
Yes. We clean and map your spreadsheets into the new structure, flag missing components, duplicate part numbers and units of measure that do not match, and import in batches. Your engineers sign off each product family before it is used for live production.
Odoo or Business Central for bill of materials software in the UAE?
Odoo Manufacturing with PLM suits most small and mid-sized UAE manufacturers and includes change orders out of the box. Business Central fits groups already on Microsoft 365 and Power BI, with deeper finance. We compare both against your product structures before recommending either.
How is BOM software different from manufacturing inventory software?
BOM software defines what a product is made of and what it costs. Manufacturing inventory software tracks the physical stock of those components, work in progress and finished goods across stores. They share one database in Odoo or Business Central, but the projects start from different problems.
Can we keep customer-specific versions of a BOM?
Yes. A product can carry several BOMs, for example a standard version and a customer-specific one, and the right version is selected on the sales or manufacturing order. Revisions keep history so repeat orders build exactly as last time.
How much does bill of materials software cost in the UAE?
We give a fixed quote in AED after a free discovery call, based on the number of products, BOM depth, integrations and data clean-up needed. Platform licences are billed separately by Odoo or Microsoft. Phasing is available, for example BOMs first and change control later.
Can bill of materials software handle approved substitute components?
Yes. Odoo and Business Central let you list alternative components on a BOM line, and Odoo can enforce an approved list. When a substitute is used, the manufacturing order records it, so the finished product's cost and traceability reflect the part actually fitted rather than the standard one.
How does BOM software support warranty claims for UAE manufacturers?
By recording the serial or lot of each key component consumed in a finished unit. When a customer reports a fault, you look up the unit's serial and see which motor, controller or batch was fitted, which helps decide whether the claim belongs with a supplier.
Do UAE manufacturers need separate BOMs for costing and production?
Usually not. One approved BOM with routings can serve both, with cost rollups calculated from component costs and operation rates. Separate costing BOMs tend to drift from reality, so we recommend a single source that engineering controls through change orders.
Why choose Shyphan?
We are a Zoho Premium Partner, an Official Odoo Partner and an independent Dynamics 365 consultancy that also builds AI and custom software, so we recommend by fit rather than by what we resell. Delivery runs from our Ras Al Khaimah office with remote delivery across all seven emirates.
Downtown Dubai at night
Get started

United Arab Emirates flagTalk to a consultant about bill of materials software

A free 30-minute call, then a written recommendation and a fixed quote in AED, including the honest option that this is not the right fit.

Vikas Saroj, Co-Founder and COO at Shyphan AI Solutions

Written and reviewed by Vikas Saroj, Co-Founder, COO & Growth at Shyphan AI Solutions, who owns delivery across India, the Gulf and the UK. Last reviewed on 29 September 2026. Meet the team · LinkedIn