WhatsApp

Request A Quote

Follow Us On:

Food processing ERP · India 2026

Food Processing ERP in India: GST, Batches and FSSAI for Fruit and Vegetable Plants

Food processing ERP in India for fruit and vegetable plants: 2025 GST rates, e-invoicing, FSSAI labels and recall records, batch traceability.

Talk to a Zoho Premium Partner

Tell us what you run today. A senior consultant, not a bot, replies within one working day with scope, timeline and a fixed quote.

Back to all articles

Choosing a food processing ERP in India means solving three things at once: GST that changed in September 2025, FSSAI records and labels, and batch traceability from the farm gate to the customer. This guide explains the rules that apply to fruit and vegetable plants and what to look for in a system.

Quick answer

Pick a system that weighs and inspects produce at receipt, holds lots in quarantine, runs production on approved recipes with critical control points, keeps batch stock in FEFO order and traces any batch both ways. It must apply the GST rates in force since 22 September 2025 (most fruit and vegetable preparations are now 5%), show HSN codes and your FSSAI number on invoices, and support e-invoicing if your turnover is above Rs 5 crore.

Fresh vegetables arriving at a food processing plant next to canned and jarred finished products

Why fruit and vegetable plants need more than accounting software

A plant that cans mushrooms, packs sweet corn or makes pickles and jams buys a raw material that changes by the hour. Two loads of the same produce can differ in freshness, moisture and damage, and both may have only days of usable life. The plant then cooks, fills, seals and packs that produce into products that must carry correct dates, a batch code and the right GST treatment when they are sold.

That creates four problems general accounting or inventory tools rarely solve together:

  • The farm gate. Weights, quality and rejections at receipt decide what you pay growers and what reaches the line.
  • Yield and wastage. Trimming, blanching and cooking losses have to be measured per batch, or product cost is a guess.
  • Proof of food safety. Buyers, auditors and FSSAI expect recipes with control points, held batches and corrective actions on record.
  • Trace and recall. When a complaint arrives, you must find every grower lot behind a batch and every customer who received it.

A food processing ERP in India brings these together with GST, so stock, quality and the ledger agree.

GST rules a food processing ERP in India must handle

GST changed significantly in September 2025. The GST Council's 56th meeting on 3 September 2025 replaced the four-slab structure with a standard rate of 18%, a merit rate of 5% and a special 40% rate for a few goods, with new rates on goods applying from 22 September 2025 (EY tax alert). CBIC issued the rate notifications on 17 September 2025 (EY).

For fruit and vegetable processors the headline is that most preparations now sit at 5%. A summary of Notification 09/2025-Central Tax (Rate) lists these headings at 5% (CMA Knowledge):

HSN headingProductsRate from 22 Sept 2025
2001Vegetables, fruit and nuts preserved with vinegar or acetic acid5%
2003Mushrooms prepared or preserved other than with vinegar5%
2004 and 2005Other prepared or preserved vegetables, frozen and not frozen5%
2007Jams, fruit jellies, marmalades, fruit purees and pastes5%
2008Other prepared or preserved fruit and nuts5%
2009Fruit and vegetable juices5%
2103Sauces, mixed condiments and seasonings5%

Check each of your HSN codes against the notified schedule. Then make sure your ERP can do the following:

  • Keep an HSN code on every item. Since 1 April 2021, tax invoices must show 4 HSN digits if your aggregate turnover in the previous year was up to Rs 5 crore, and 6 digits above that (Notification 78/2020-Central Tax). Smaller taxpayers may omit HSN on supplies to unregistered persons.
  • Split CGST and SGST from IGST automatically based on the place of supply.
  • Generate e-invoices. E-invoicing applies to businesses whose aggregate turnover exceeded Rs 5 crore in any financial year from 2017-18, from 1 August 2023 (EY).
  • Report on time. From 1 April 2025, businesses with aggregate turnover of Rs 10 crore or more must report invoices, credit notes and debit notes to the IRP within 30 days, and the portal rejects older documents (GST e-invoice portal).
  • Track input tax credit on packaging, ingredients and services so the 5% output rate does not leave you with stranded credit you have not noticed.

FSSAI requirements that land on your system

FSSAI rules are mostly about records and labels, which is exactly where an ERP helps or hurts.

RequirementWhat it saysWhat the ERP should do
Licence number on invoicesAn FSSAI order of 8 June 2021 requires the 14-digit licence or registration number on cash receipts, invoices, cash memos and bills, mandatory from 1 October 2021. GST e-way bills and other system-generated government documents are excluded (SCC Online).Print the FSSAI number from the company profile on every sales document.
Date markingFor products with more than three months of shelf life, dates may be shown as month and year (for example MAY 2021) or as DD/MM/YY. The FSSAI logo and licence number must appear on the label in a contrasting colour (FSSAI labelling FAQ).Store manufacturing, packing and expiry or best-before dates on each batch and send them to label printing.
Recall planEvery food business engaged in manufacture, import or wholesale supply must have an up-to-date recall plan, and must be able to identify the businesses it supplied (FSSAI recall FAQ).Trace any batch forward to customers and backward to suppliers in minutes.
Distribution recordsThe Food Recall Procedure Regulations, 2017 require records of supplier and customer names and addresses, lot and batch codes, pack size, brand and dates, kept for one year from the best-before or expiry date (regulation text).Keep these fields on GRNs, batches and delivery notes, and block deletion.
Annual returnManufacturers, including repackers and relabellers, file the annual return on FoSCoS by 31 May. The penalty is Rs 100 per day from 1 June, up to five times the annual licence fee (FSSAI advisory, 16 April 2024).Report production and dispatch quantities by product for the financial year.

The recall FAQ also says a recall press release should be completed within two hours of being notified of the recall. That is only possible when the batch data is already clean.

Key takeaways

  • Most fruit and vegetable preparations, jams, juices and sauces moved to 5% GST from 22 September 2025, so tax masters need updating.
  • E-invoicing applies above Rs 5 crore turnover, and businesses at Rs 10 crore or more must report to the IRP within 30 days.
  • FSSAI requires the licence number on invoices, a recall plan for manufacturers and distribution records kept one year past best-before or expiry.
  • Traceability depends on five links: weighbridge, incoming QC, FEFO batch stock, production stages and batch release.
  • Run a mock recall and a GST reconciliation before switching off the old system.

Batch traceability from farm gate to customer

Traceability is a chain, and it breaks at the weakest link. A sound design records five moments:

  1. Weighbridge and GRN. Gross, tare and net weight per vehicle, compared with the quantity the supplier claims. This is also your best defence in weight disputes.
  2. Quarantine and incoming QC. Every received lot is held until it is inspected against parameters such as freshness, damage or temperature, then accepted, held or rejected. Rejections should raise a non-conformance report automatically.
  3. Batch stock in FEFO order. Short-life produce must be issued first-expiry-first-out, with held, rejected and expired quantities blocked from issue.
  4. Production stages. Each work order links the raw material lots it consumed to the finished batch, with stage records for processing, filling, sealing and packing, and the critical control points from the recipe.
  5. Release and dispatch. Finished goods QC and a formal batch release decide what can be sold. Delivery notes record which batch went to which customer.

With those links in place, a recall becomes a query, not a week of phone calls. Test it with a mock recall before you go live.

Plan your food processing ERP

Talk to Shyphan about weighbridge, QC, recipes, batch traceability and GST set-up for your plant.

Talk to an expert

Checklist for comparing food processing ERPs

AreaAsk the vendor to show
SourcingRFQs and supplier comparison on price, quality, delivery and rejection history, plus supplier scorecards
ReceivingWeighbridge records linked to the GRN, partial and rejected receipts
QualityIncoming, in-process and finished goods QC, batch holds that only a QC manager can release, NCR and CAPA
RecipesVersioned recipes with steps, temperatures, times and critical control points, and approval of new versions
ProductionWork orders on an approved recipe version, stage tracking, yield, wastage and downtime
InventoryBatch stock in FEFO order, expiry management, bins and storage zones
Sales and dispatchCredit check, FEFO reservation of released stock, delivery notes with vehicle details
FinanceGST reports, HSN-wise summary, input tax credit, e-invoice route and costing that reconciles stock with the ledger

If you also run non-food lines, compare this list with a general manufacturing ERP scope. Software costs vary widely with users, plants and modules, so ask each vendor for a written quote covering licences, implementation, data migration and annual support for the same scope.

Implementation steps

  1. Update your tax master first. Re-check every HSN code and rate against the 22 September 2025 schedule before migrating items.
  2. Define quality parameters for each raw material and finished product, with accept and reject limits.
  3. Write recipes with CCPs and get them approved by the QC manager, so production can only run on approved versions.
  4. Register suppliers and growers with their documents and starting scores.
  5. Load opening stock by batch with real expiry dates, and quarantine anything doubtful.
  6. Set roles and approvals for purchase, stores, QC, production, sales, dispatch and accounts.
  7. Run one line in parallel for a few weeks during a normal season, then move the other lines.
  8. Run a mock recall and a GST reconciliation before you switch off the old system.

How Shyphan's Agro Processing ERP handles this

Shyphan's Agriculture and Agro Trading ERP is built around a single Indian food processing plant that buys fresh produce from growers and packs canned vegetables, brined mushrooms and pickles in cans, jars and pouches. It suits fruit and vegetable processing and agribusiness sourcing and processing.

  • Procurement and suppliers: requisitions, RFQs, supplier comparison with weighted scoring on landed price, quality, delivery and rejection, and scorecards that update after every QC and receipt.
  • Receiving: weighbridge records with gross, tare and net weight per vehicle and the variance against the GRN quantity. Every line lands in quarantine.
  • Quality: incoming, in-process and finished goods QC, batch holds released only by a QC Manager, NCRs raised automatically on rejections and holds, and CAPA with verification.
  • Recipes and production: recipes with process steps, temperatures, times and CCPs, work orders on an approved BOM version, and stage screens for processing, filling, sealing and packing with yield and wastage.
  • Inventory and dispatch: batch stock in FEFO order, warehouse bins and transfers, credit checks and FEFO reservation on sales orders, and delivery notes with vehicle and transporter details.
  • Traceability: any batch traced back to growers and GRNs and forward to customers, with recalls that block affected batches from sale.
  • GST and finance: company profile with GSTIN, PAN, state code and FSSAI licence number, HSN codes on items, CGST and SGST or IGST, HSN-wise outward summary, input tax credit and manufacturing costing that reconciles stock with the ledger.

Two points to check during scoping. The demo's tax settings list GST at 0%, 5%, 12%, 18% and 28%, so the rate table should be updated to the post-September 2025 structure. IRP e-invoice reporting is not among the documented features, so agree the e-invoicing route if your turnover is above Rs 5 crore. The product is English only with INR.

Try the live demo by choosing a demo user from the Login IDs list on the sign-in screen. Shyphan, a Zoho Premium Partner with 500+ projects and an office in Noida, can help you plan the rollout.

Sources

Frequently Asked Questions

What GST rate applies to pickles, jams and canned vegetables now?
Under the rates in force from 22 September 2025, headings 2001 to 2009, covering preserved vegetables, mushrooms, jams and juices, are listed at 5%. Confirm each HSN code against the notified schedule.
Is e-invoicing mandatory for a food processing company?
It applies if your aggregate turnover exceeded Rs 5 crore in any financial year from 2017-18. If turnover is Rs 10 crore or more, invoices must also be reported to the IRP within 30 days.
Do we have to print the FSSAI number on invoices?
Yes. An FSSAI order of 8 June 2021 made the 14-digit licence or registration number mandatory on receipts, invoices, cash memos and bills from 1 October 2021, with GST e-way bills excluded.
How long must we keep distribution records for recall?
The Food Recall Procedure Regulations, 2017 require them for one year from the best-before or expiry date, as applicable.
When is the FSSAI annual return due?
Manufacturers, repackers, relabellers and importers file it on FoSCoS by 31 May. Late filing costs Rs 100 per day from 1 June, up to five times the annual licence fee.
What is the difference between FEFO and FIFO?
FIFO issues the oldest received stock first. FEFO issues the stock with the earliest expiry date first, which suits short-life produce and finished goods with printed dates.

Related reading

Get Started

Request your free Zoho quote

Tell us about your project and a senior Zoho Premium Partner consultant, not a bot, replies within 24 hours with scope, timeline and a fixed quote. The first 30-minute discovery call is free, with no obligation.

  • Free 30-minute discovery call
  • Fixed-quote SOW, no surprises
  • Implementation, customization & migration
  • SLA-bound AMC support